My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 11-30-1998
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1998
>
CCP 11-30-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:14:59 PM
Creation date
11/10/2006 4:49:52 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. It.!::: . <br />AT-rMtJ <br /> e <br />Mr. Brian Fritsinger <br />November 20,1998 <br />Page 2 . <br />include additional signage for Alternative B ($13,900.00) and additional mobilization costs <br />($20,800.00 base upon 5% of project costs). <br />The estimated storm sewer costs for Alternative B are approximately $52,000.00 greater than <br />those estimated for Alternative D. The difference is a result of longer pipe lengths for each series <br />of catch basins and approximately 14 extra catchbasins for median drainage. The current storm <br />sewer cost estimate for Alternative B is greater than the estimate included in the feasibility report <br />by approximately $52,000.00. This increase was made to reflect additional structures and <br />connections to existing business driveways along the route. Both alternatives will need to <br />provide catchbasins and storm sewer connections to the existing properties. This work was <br />included as a result of the refinement of the roadway design. <br />Alternative B would require the acquisition of a 6 foot wide strip along the existing private <br />properties to provide for a minimum of 6 feet of right of way adjacent to the eastern curb line. <br />Both alternatives include the purchase of a 15 foot wide permanent trail and utility easement <br />along the eastern side of the roadway for sidewalk, snow storage and private utility placement. <br />Detailed construction cost estimates are attached for your review. <br />Cost Per Foot Comparison . <br />Recent residential street reconstruction projects within the City have cost approximately $200 per <br />foot of roadway. The proposed improvements for West Round Lake Road Phase 2 are estimated <br />to cost approximately $575 (Alternative B) or $500 (Alternative D). The factors generating the <br />higher per foot costs are outlined below as they relate to Alternative D. The estimated additional <br />costs include the 10% contingency and 26% indirect costs: <br />1) Traffic Control: The West Round Lake Road improvements include significant <br />aliowances for traffic control which includes items such as concrete J-barrier, <br />temporary paving, temporary signage and temporary striping which normally are <br />unnecessary for low volume residential streets. Estimated additional cost: <br />$IOO,OOO.OO(Alt D). <br />2) Pavement section: The proposed pavement section for West Round Lake Road <br />includes 70% more bituminous surface mix, 50% more aggregate base and 50% more <br />sand subbase as the typical residential street. The heavier pavement section is <br />necessary to provide for adequate carrying capacity for the truck traffic expected on <br />the roadway. Estimated additional cost: $ 130,000.00(Alt D). <br />3) Retaining WalllSoil Correction: The expansion of West Round Lake Road will <br />require the additional excavation and construction of a retaining wall along the Nott <br />Company parcel. In addition, the cost estimate includes provisions for approximately <br />$20,000 in soil correction in roadway areas. Estimated additional cost: . <br />$1 56,000.00(Alt. D). <br />U:\WPDOC'S ARDENHIL \ROUNDLAK\COSTCOMP.MEM <br />
The URL can be used to link to this page
Your browser does not support the video tag.