<br />. It], <br />. Mf-4-c.Jl <br /> 8 <br /> Mr. Brian Fritsinger <br /> November 20, 1998 <br />. Page 3 <br /> 4) Roadway Width: Alternative D includes the construction of a 44 foot roadway with <br /> a 6 foot wide sidewalk. Typical residential streets are 32 feet wide and do not include <br /> sidewalks. Estimated additional cost $125,000.00(Alt D). <br /> 5) Miscellaneous: The West Round Lake Road project includes estimated costs for <br /> modifications to the three TCAAP monitoring wellheads, permanent signage, striping <br /> and pavement markings which is more extensive than typical residential streets, <br /> clearing and grubbing and removal of existing culverts. Estimated additional cost: <br /> $70,000.00. <br /> 6) Stonn Sewer: The West Round Lake Road project includes stonn sewer <br /> catchbasins for the roadway as well as catchbasins for the commercial driveways. <br /> Overall pipe lengths are longer than typical residential streets and pipe diameters are <br /> greater to handle the larger flows from roadway and business runoff. Estimated <br /> additional cost: $85,000. <br /> Rnhancements <br /> Preliminary cost estimates for potential enhancements to the proj ect have been included for your <br /> infonnation. The enhancements include streetlighting, landscape trees, landscape shrubs and <br />. irrigation system. Enhancements could be included with the base project or added to the <br /> roadway at a nlture date. The irrigation system is assumed to provide irrigation to median areas <br /> only and therefor would be necessary if Alternative B were chosen. Trees and shrubs could be <br /> incorporated into either alternative however, it is likely that Alternative B would require more <br /> landscaping due to the median areas. A major factor in selecting Alternative B would be the <br /> desire to create an aesthetic corridor in which landscaping would playa major role. Ifthe <br /> Council selects Alternative B, the inclusion of irrigation and landscaping into the project at this <br /> time should be strongly considered. The estimated cost landscaping trees and shrubs is based <br /> upon typical plant materials at a unifonn spacing. If the council elects to include landscaping in <br /> the project, a more detailed range of landscaping alternatives and costs will be prepared for <br /> approval. <br /> The estimate for pedestrian lighting is primarily intended to provide for lighting along the <br /> sidewalk for pedestrian safety. This area is very dark at night and several property owners stated <br /> that they would like to have some level of lighting for workers utilizing the sidewalk at night or <br /> early morning. The City has not provided streetlighting or pedestrian lighting on city streets to <br /> date. <br />. <br /> U:\WPDOCS ..$,RDENHIL\ROUNDLAK'.COSTCOMP.MEM <br />