My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 12-07-1998
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1998
>
CCP 12-07-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:15:01 PM
Creation date
11/10/2006 4:49:54 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Mr, Brian Fritsinger <br /> November 20, 1998 <br /> Page 2 . <br /> include additional signage for Alternative B ($13,900,00) and additional mobilization costs <br /> ($20,800.00 base upon 5% of project costs), <br /> The estimated storm sewer costs for Alternative B are approximately $52,000.00 greater than <br /> those estimated for Alternative D, The difference is a result of longer pipe lengths for each series <br /> of catch basins and approximately 14 extra catchbasins for median drainage. The current storm <br /> sewer cost estimate for Alternative B is greater than the estimate included in the feasibility report <br /> by approximately $52,000,00, This increase was made to reflect additional structures and <br /> connections to existing business driveways along the route, Both alternatives will need to <br /> provide catchbasins and storm sewer connections to the existing properties, This work was <br /> included as a result of the refinement of the roadway design. <br /> Alternative B would require the acquisition of a 6 foot wide strip along the existing private <br /> properties to provide for a minimum of6 feet of right of way adjacent to the eastern curb line, <br /> Both alternatives include the purchase ofa 15 foot wide permanent trail and utility easement <br /> along the eastern side of the roadway for sidewalk, snow storage and private utility placement <br /> Detailed constmction cost estimates are attached for your review. <br /> Co~t Per Foot Comparison . <br /> Recent reside:ltia: Weet reconstruction pr,)jects within the City have cost approximately $200 per <br /> foot of roadway, The proposed improvements for West Round Lake Road Phase 2 are estimated <br /> to cost approximately $575 (Alternative B) or $500 (Alternative D), The factors generating the <br /> higher per foot costs are outlined below as they relate to Alternative D, The estimated additional <br /> costs include the 10% contingency and 26% indirect costs: <br /> I) Traffic Control: The West Round Lake Road improvements include significant <br /> allowances for traffic control which includes items such as concrete I-barrier, <br /> temporary paving, temporary signage and temporary striping which normally are <br /> unnecessary for low volume residential streets, Estimated additional cost: <br /> $1 OO,OOO.OO(Alt D), <br /> 2) Pavement section: The proposed pavement section for West Round Lake Road <br /> includes 70% more bituminous surface mix, 50% more aggregate base and 50% more <br /> sand subbase as the typical residential street The heavier pavement section is <br /> necessary to provide for adequate carrying capacity for the truck traffic expected on <br /> ... .." the roadway, Estimated ~dditio[jal cost: $130,000,OO(Alt D). <br /> 3) Retaining Wall/Soil Correction: The expansion of West Round Lake Road will <br /> require the additional excavation and construction of a retaining wall along the Nott <br /> Company parcel. In addition, the cost estimate includes provisions for approximately <br /> $20,000 in soil correction in roadway areas, Estimated additional cost: . <br /> $156,000,OO(Alt D), <br /> U-"WPDOCS ARDE~nIlL"ROUNOLAK\COSTCOMP.MEM <br />
The URL can be used to link to this page
Your browser does not support the video tag.