Laserfiche WebLink
<br /> , <br />Resolution No. 98-71 November 30, 1998 . <br />Demolition, wrecking, relocating and moving buildings..........,....................., 50,00 <br />(for all types of buildings, including mobile home relocation) <br />ST ATE SURCHARGE."..",....:."..,."..""..."...,."".....".,.........',......,.,..""....,., .50 <br />Fence Construction <br />Base Fee.... ..... ,.....' ".,.. ",.....",.,.',..." ,.... ,. ,..... .... "" .',.,. "..,.....',. "..'. ".. ".", ...., ,.". $ 15,00 <br />Plus Per 100 Feet............,....,..,............,...",......................"...........,............",..., 6.00 <br />STATE SURCHARGE.........................,...",...,..,...................,....,.....,..,........... .50 <br />Blacktop or Concrete Sidewalks, Parking Lots, Driveways <br />Base Fee.. ,.. ,. ",., "., ".. ,. ,... ,. ....., ....'" ".", ",.. ,. "".., "...,.. ,.,. ,. "., ".,., ...... ""." ". "',' "., 18,00 <br />Plus Per 1000 Feet.."....".....,...,......,......""....,..,......,...........,...,.....,....,....",....,..,.. 6.00 <br />STATE SURCHARGE...,.....,...,.........,...........,.......,..........,.....................,......., .50 <br />Plumbing Permit <br />First Fixture.. ,.."......., ,....,.....,. ..... ,........,...." ,...., ....... ,..'" ,..' ,..,.. ,..... ..... .............. 15.00 <br />Each Additional Fixture.....,.."" ,.....,...,..,..." ,..,..' ,...... ,....' ,..,....., ,.. ,.. ....., ,..... '..... 7.50 <br />Minimum Fee..,..".......,.,..", ,...""...,..,...,..,...,...."",..."".......,......'..."..,.., "........ 25,00 <br />STATE SURCHARGE.,..."".."",.."".....,.......,..""..."".....,..,....".......,....",..... ,50 <br />Electrical Permit <br />Minimum Fee....,...,..""",.""..""".,."".".,..",..."."".....,.."...,......'"",."....,',..,",. 22.00 . <br />ST ATE SURCHARGE.........""....,......,....,......"..,.."..,......",.....,.......,.......,.... .50 <br />Residential, Commercial, Industrial and Institutional Heating or Mechanical Permit <br />Based upon value of mechanical contractor bid <br />Residential." ,.."......' ,....,..",.., ,.."" ,.... ,.., ,.., ..'........".."............. ,........" 2% of total bid <br />CommerciallIndustrial/InstitutionaL. ,....'..,.......,..."..............,.. ,....' * 1.5% of total bid <br /> * + $50.00 <br />Minimum Fee"..,..,..".,.."",.."""..,.,..,.,......,."..,..,.......,......,....,....,.., 35.00 <br />STATE SURCHARGE..",....""..",....."....,.."..., ".....,......""......,.., *,50 <br /> * Surcharge computation is based on the permit fee, Surcharge <br /> equals ,0005 of each permit fee, or $,50, whichever is greater. <br />Fire Protection Permit <br />The fees are based upon Table LA of the 1997 U,B.C. and are to be determined by the <br />City's Building Inspector. <br />... H_'" <br />M ,IUS ERSIS H E I LA ICOUNCILIRESOLU1i99FEES, WPD <br /> . <br />