My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 12-07-1998
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1998
>
CCP 12-07-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:15:01 PM
Creation date
11/10/2006 4:49:54 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. . <br />IIBRw <br />fSt1:(.III:M A"DAMES- &MOORE-GROUP--COMPANi---~-'---_._-------- . <br />Mr, Brian Fritsinger <br />November 18, 1998 <br />Page 2 <br />The proposed material suppliers and subcontractors are acceptable to the City Engineer. <br />Both the Public Works Director and City Engineer have experience working with Jay Bros., !nc, on other <br />types of projects in the past and have some concerns about their ability to complete this project. Past <br />problems have occurred with meeting schedules and substandard workmanship. In all cases Jay Bros, has <br />corrected deficiencies as asked prior to completing the projects, In order to assist in our evaluation of Jay <br />Bros, ability to complete the work, we asked the contractor to provide references relating specifically to <br />sanitary sewer lift station construction, The contractor has provided the City Engineer with a list of <br />references and the Public Works Director and City Engineer have contacted many of the references, All <br />references contacted indicated that Jay Bros, performed acceptable work although schedules were not always <br />met. The contract specifications include specific completion dates for project milestones and Jay Bros, have <br />submitted a schedule indicating that they can meet these dates, <br />Based upon our review as outlined above, we feel that Jay Bros" Inc. and their designated subcontractors <br />are capable of satisfactorily completing the work required by this project. We also feel that the bid price is <br />reflective of current market conditions and is a fair price for the proposed improvements. We, therefore, <br />recommend the award of the Lift Station #3 Reconstruction Project to Jay Bros. Inc. for the total amount <br />of $69,593.00. <br />The project schedule outlined below is contingent upon award by the City Council on November 30,1998: . <br /> Award Contract November 30, 1998 <br /> Begin Construction December 7, 1998 <br /> Complete Construction April30, 1999 <br />Please call me at 373-6479 if you have any questions or need additional information.. <br />Sincerely, <br />BRW, Inc, <br />^/;~tJ:! /k.- <br />Gregory, own, PE, BRW, Inc. <br />Arden ill?City Engineer <br />Enclosure <br />cc: Dwayne Stafford/Arden Hills <br /> Terry Post! Arden Hills <br /> Jon HomlBRW <br /> Nick LandwerlBRW <br /> Mark Lynch/BRW <br /> File 37951 006 1001 <br /> . <br /> Offices Worldwide <br />
The URL can be used to link to this page
Your browser does not support the video tag.