My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 12-14-1998
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1998
>
CCP 12-14-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:15:04 PM
Creation date
11/10/2006 4:50:03 PM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> FIVE-YEAR CAPITAL IMPROVEMENT PLAN <br /> DEPARTMENT PROJECT TITLE PROJECT NUMBER FIVE-YEAR COST <br /> Parks and Recreation Paving Cummings 603-99 $27,000 <br /> Area Park <br /> SCHEDULED PROJECT ACTIVITY <br /> FUNDING SOURCE 1999 2000 2001 2002 2003 FUTURE <br /> Park Fund $27,000 <br /> LOCATION . <br /> Cummings Park <br /> DESCRIPTION <br /> Grading, sub-surface and asphalt inside the hockey rink for in-line skating use during the spring, <br /> summer and fall. <br /> JUSTIFICATION <br /> In-line skaters are using tennis and basketball courts for hockey games. The surface on those courts is <br /> not conducive to the skate wheels and it peels up, Having skaters on the basketball or tennis courts <br /> shortens the longevity of the surface material on those facilities, <br /> CURRENTSTATUS~ROJECTEDSCHEDULE <br /> The improvement is proposed for 1999. <br /> I <br /> RELATIONSHIP TO EXISTING PLANS AND OTHER PROGRAMS <br /> The City has had several requests to pave rink areas. The other potential area is Freeway Park. <br /> Cummings was the top priority because of its close proximity to trails. Theoretically, users can skate <br /> to the park. <br /> . <br />
The URL can be used to link to this page
Your browser does not support the video tag.