My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 01-04-1999
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1999
>
CCP 01-04-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:15:07 PM
Creation date
11/13/2006 11:11:06 AM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />.'BRW <br /> <br />.. . A oAMES"i"MOoREGROU"p-Ci5M'iiA'Njf <br /> <br />:C~ff1~ (/ I/z.- <br />MEMORANDUM <br /> <br />RECr:':IVED <br />DEe 3 0 1998 <br />(mOt A.~j)~lt :~,., ,> <br /> <br />BRW <br />Thresher Square <br />700 South Third Street <br />Minneapolis, MN 55415 <br />Phon.' (n 171170-0700 <br />Fax: (612) 370-1378 <br /> <br />To: <br /> <br />Kevin Ringwald/Arden Hills <br /> <br />File:37951 005 2301 <br /> <br />From: <br /> <br />Greg Brown/BRW, <br />Arden Hills City Engineer <br /> <br />Date: <br /> <br />Deccmbcr 29, 1998 <br /> <br />Subject: Round Lake Road Phase 1 <br />Engineers EstimatelCounty Cost Participation <br /> <br />The following is a revised summary of the Engineer's Estimate for the West Round Lake Road <br />Improvements, Phase 1 based upon the modifications to grading and storm sewer plans which <br />were recently made as a result of discussions with City staff. The Ramsey County participation <br />is based upon the latest plan modifications and recent discussions with City staff and Jim Tolaas: <br /> <br />Topsoil prices could range from -2,OO$/m3 to +4,OO$/m3 resulting in a ($40,000,00) <br />deduct or an add of $80,000,00 to the construction estimate above, The final price <br />will depend on the perceived quality of the material, topsoil market conditions at bid <br />time and use of adjacent land for temporary stockpiling, <br />Any costs/deducts associated with the Topsoil Excavation alternate item will be <br />shared with Ramsey County in a manner similar to the general acquisition cost split. <br />It is assumed that Ramsey County will not be responsible for costs associated with <br />Sanitary Sewer, Watermain, Landscaping or Median Pavers, <br /> <br />Estimated Base Bid Costs: <br />Roadway <br />Storm Sewer <br />Sanitary Sewer <br />Watermain <br />Subtotal Base Bid <br />Estimated Bid Alternate Costs: <br />Topsoil Excavation <br />Landscaping <br />Median Pavers <br />Subtotal Alternates <br /> <br />Notes: <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />U:\WPDOCS\ARDENJITL\ROUNDLAKICNTYCST2.MEM <br /> <br />$436,500,00 <br />$238,500.00 <br />$ 8,050,00 <br />$ 53,190 00 <br />$736,240,00 <br /> <br />$ 80,000,00 (conservative) <br />$ 39,370,00 <br />$ 8,000 00 <br />$127,370,00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.