<br />Mr. Kevin Ringwald
<br />December 29, 1998
<br />Page 2
<br />
<br />.
<br />
<br />Ramsey County Roadway Participation is estimated at $238,600.00, This is based on
<br />participatIOn (j:y70% 01 roadway Items (not mcludmg curb and gutter, walks, tencmg), this
<br />participation does include approximately 70% of$15,000,OO for the installation ofa signal
<br />control cabinet.
<br />
<br />Ramsey County Storm Sewer Participation is estimated at $165,600,00, This is based on
<br />participation @ 75% of general pond items (clearing, grading, seeding) and 100%' of 900mm
<br />pipe and associated structures,
<br />
<br />Engineering Fees:
<br />Total estimated engineering related fees are approximately $152,500,00, This, total is based upon
<br />total estimated BRW fees of$147,354,OO (through construction) and American Engineering and
<br />Testing fees of approximately $5,000,00 (through construction), Fees for BRW are based upon a
<br />construction cost of $776,240,00. Actual fees will be based upon the average of the low three
<br />bids per our standard contract.
<br />
<br />Breakdown of Engineering Related Fees
<br />. 6,6% for feasibility, prelim design, final design & bidding
<br />. 10% for construction administration/inspection
<br />. Additional Services:
<br />Registered Land Surveying/Right of Way /Easement Prep.
<br />Field Surveying
<br />Wetland Delineation
<br />. Expenses including mileage, printing, delivery
<br />Total Estimated BRW Fees
<br />
<br />Total Estimated Geotechnical Subconsultant Fees
<br />(Borings, Report and Construction Testing)
<br />
<br />$ 51,230,00
<br />$ 77,624,00
<br />
<br />.
<br />
<br />$ 9,000,00
<br />$ 4,500,00
<br />$ 2,000.00
<br />$ 3,00000
<br />$147,354,00
<br />
<br />$ 5,000,00
<br />
<br />Assuming that Ramsey County will reimburse the City for Engineering fees on a comparable
<br />basis to the County reimbursement for construction costs (52% overall), then the County should
<br />reimburse the City approximately $80,000,00 for engineering related services,
<br />
<br />Ramsey County Participation Summary:
<br />
<br />Roadway
<br />Storm Sewer
<br />Engineering
<br />Total Estimated Ramsey County Cost Participation
<br />
<br />$238,600,00
<br />$165,600,00
<br />$ RO,OOO 00
<br />$484,200.00.
<br />
<br />If you would like more information or have any questions regarding this summary please give