Laserfiche WebLink
<br />.~/ <br />11/ <br /> <br />Mr. Kevin Ringwald <br />December 29, 1998 <br />Page 2 <br /> <br />. <br /> <br />Ramsey County Roadway Participation is estimated at $238,600.00, This is based on <br />participatIOn (j:y70% 01 roadway Items (not mcludmg curb and gutter, walks, tencmg), this <br />participation does include approximately 70% of$15,000,OO for the installation ofa signal <br />control cabinet. <br /> <br />Ramsey County Storm Sewer Participation is estimated at $165,600,00, This is based on <br />participation @ 75% of general pond items (clearing, grading, seeding) and 100%' of 900mm <br />pipe and associated structures, <br /> <br />Engineering Fees: <br />Total estimated engineering related fees are approximately $152,500,00, This, total is based upon <br />total estimated BRW fees of$147,354,OO (through construction) and American Engineering and <br />Testing fees of approximately $5,000,00 (through construction), Fees for BRW are based upon a <br />construction cost of $776,240,00. Actual fees will be based upon the average of the low three <br />bids per our standard contract. <br /> <br />Breakdown of Engineering Related Fees <br />. 6,6% for feasibility, prelim design, final design & bidding <br />. 10% for construction administration/inspection <br />. Additional Services: <br />Registered Land Surveying/Right of Way /Easement Prep. <br />Field Surveying <br />Wetland Delineation <br />. Expenses including mileage, printing, delivery <br />Total Estimated BRW Fees <br /> <br />Total Estimated Geotechnical Subconsultant Fees <br />(Borings, Report and Construction Testing) <br /> <br />$ 51,230,00 <br />$ 77,624,00 <br /> <br />. <br /> <br />$ 9,000,00 <br />$ 4,500,00 <br />$ 2,000.00 <br />$ 3,00000 <br />$147,354,00 <br /> <br />$ 5,000,00 <br /> <br />Assuming that Ramsey County will reimburse the City for Engineering fees on a comparable <br />basis to the County reimbursement for construction costs (52% overall), then the County should <br />reimburse the City approximately $80,000,00 for engineering related services, <br /> <br />Ramsey County Participation Summary: <br /> <br />Roadway <br />Storm Sewer <br />Engineering <br />Total Estimated Ramsey County Cost Participation <br /> <br />$238,600,00 <br />$165,600,00 <br />$ RO,OOO 00 <br />$484,200.00. <br /> <br />If you would like more information or have any questions regarding this summary please give <br />me a call, . <br /> <br />U:\WPDOCS\ARDENHIL\ROUNDLAK\CNTYCST2.MEM <br />