Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />e <br /> <br />CITY OF ARDEN HILLS <br /> <br />MEMORANDUM <br /> <br />DATE: <br /> <br />February 18, 1999 <br /> <br />TO: <br /> <br />Brian Fritsinger, City Administrator <br /> <br /> <br />Dwayne Stafford, Public Works Director~. <br /> <br /> <br />Monthly Department Head Report <br /> <br />FROM: <br /> <br />SUBJECT: <br /> <br />Public Safety Commis.~ion <br />At the next meeting, scheduled for Thursday, Febrnary 18'" at City Hall, the agenda includes <br />discussion of the locations, wording, and number of signs to be installed referencing the new <br />overnight parking ordinance adopted at the February 8'" City Council meeting. Maps with <br />traffic counts have been provided to commission members for assistance with this project. <br /> <br />Round Lake Road. Phase I Project <br />Negotiations have been continuing with two local excavating contractors to sell the Indykiewicz <br />dirt piles. Test holes will be dug in the piles this week to determine the content and value of the <br />soil. At this time, staff is leaning toward recommending to Council acceptance of the low base <br />bid, plus the landscaping alternate on Phase 1. Staff would then sell the excess dirt, independent <br />of the Phase I project. <br /> <br />Lift Station No.3 <br />Good progress was made on lift station number 3 reconstruction this past month, and if all goes <br />well, the new station should be in operation within a week. Public Works employees inspected <br />the mechanical portion and control panel of the new station along with City Engineer Brown and <br />work to-date looks good. The City provided pea rock from seal coat sweepings for bedding <br />around and under the lift station to ensure a stable foundation. <br /> <br />Public Works Department <br />The department has not had that much snow to plow this month, but the same amount of salt and <br />sand was used as if we had lots of snow. Whether we have 1/4" of sleet, 1" or I' of snow, about <br />the same amount of sand/salt mix is used, and it seemed like we have sanded every other day. <br />