My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 03-29-1999
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1999
>
CCP 03-29-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:15:20 PM
Creation date
11/13/2006 11:16:02 AM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />, <br /> <br />. <br /> <br />An Official Map is a tool, authorized by State planning, enabling legislation that ... <br />communities can use to make sure that the aspects of their comprehensive plans . <br />will be carried out. In effect, it is like a zoning map for future public lands such <br />as road right-of-ways, parklands, and sites for public buildings. The Official Map <br />gives an opportunity for" ... both the public and private property owners to adjust <br />to their building plans equitably and conveniently before investments are made <br />which will make such adjustments difficult to accomplish." <br /> <br />If the City wishes to acquire or utilize the land; then after an Official map is <br />adopted and filed with the County, the City is not required to compensate the <br />landowner for structures placed without a permit or in violation of the conditions <br />of a permit in any area designated on the Official Map. <br /> <br />In 1993, the City Council amended the Official Map, Transportation Element of <br />the City's Comprehensive Plan, indicating that the cormection of Shoreline Lane <br />would be via a straight through alignment (Attachment B). <br /> <br />Some of the reasons for the adoption of the straight through alignment were to <br />impr6ve the traffic pattern and safety access in the area (per the City Council <br />minutes July 12, 1993.) <br /> <br />Staffhas received six letters from residents pertaining to development in this area <br />(Attachment C). <br /> <br />e <br /> <br />Roadway Design. The applicant submitted a proposal showing a cul-de-sac on <br />the south section of Shoreline Lane. The resulting cul-de-sac would be 600 feet <br />long when 500 feet is the maximum length per the Subdivision Ordinance Section <br />22-8, (c), (10). The cul-de-sac shown appears to be a 50 foot radius. The <br />Subdivision Ordinance in Section 22-8, (c), (I), requires a 60 foot wide radius for <br />cul-de-sac's. The extension of the north section of Shoreline Lane is shown with <br />no change to the existing dead end configuration. <br /> <br />The applicant has submitted advantages and disadvantages as depicted in the <br />previous official map study. Disadvantage number 3 listed states that "only <br />partiaUy resolves dead-end situation to the north." The Staff would concludes that <br />the failure to plan for the northerly cul-de-sac is not an acceptable solution. <br /> <br />Additional Options. Staff created two options (Attachment D) that show how a <br />120 foot diameter cul-de-sac meeting the Subdivision Ordinance may look if <br />placed on the north section of Shoreline Lane. We have also depicted a 120 foot <br />diameter cul-de-sac on the south section of Shoreline Lane. <br /> <br />Option A, shows a cul-de-sac from the north expanding beyond the Bachman <br />properly creating a need to acquire property frorn the Josephine East LLC <br />property. Parcel 3 of the Josephine East LLC property would be reduced to ... <br />10,325 square feet with a reduced buildable area. ., <br />
The URL can be used to link to this page
Your browser does not support the video tag.