My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 04-26-1999
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1999
>
CCP 04-26-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:15:23 PM
Creation date
11/13/2006 11:17:05 AM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br />e <br /> <br />e <br /> <br />~OOl~~Y <br /> <br />ARDEN HILLS PLANNING COMMISSION - APRIL 7, 1999 <br /> <br />11 <br /> <br />The proposed Parcel IV contains the existing two-story building. Parcel ill is proposed to <br />contain the two-story addition under construction. The applicant wishes to subdivide the <br />property to place the existing building and addition on their own lots for financial reasons. The <br />applicant propose~ that both lots would access to Lexington Avenue and/or Femwood Avenue <br />via the existing private road with easements. In addition, easements will need to be created for <br />utilities and parking, in order to create an invisible property line. In short, the applicant wishes <br />to create a zero lot line subdivision for this industrial campus. The applicant intends to keep the <br />parcel under the same ownership; however, Staff needed to evaluate the proposal as if the parcels <br />were under separate ownership in the event that in the future the parcels were to break into <br />separate ownership's. <br /> <br />Easements will be needed for a variety of items, not only for access, but for utilities as well. <br />Utilities are currently based out of the existing building, such as heat, ~ewer, water, etc. <br /> <br />Both lots meet the minimwn area and depth requirements. With regard to minimwn width, the <br />proposed Parcel ill will not have frontage on a publicly dedicated street. <br /> <br />With regard to setbacks for the structure, the applicant is requesting a zero property line by <br />putting the property line between the two buildings with a 10-foot rear yard setback. <br /> <br />There have been several cases approved similar in nature to this proposal. The subdivision of the <br />CSM/DynaMark property at 4255 and 4265 Lexington Avenue was split in a similar fashion with <br />a zero lot line parking lot including access easements. The Control Data buildings at 4201 and <br />4233 Lexington Avenue was split by a zero lot line such that the parking, utilities, and building <br />were all divided into three lots. <br /> <br />Ms. Randall advised that the Staff recommends approval of Planning Case #99-06, preliminary <br />plat, including variances for a zero building setback where 20 feet is required, zero parking <br />setback where five feet is required, and to allow the use of a private drive rather than a public <br />street, subject to the following conditions: <br /> <br />1. Provision of the required easements for access, parking, sewer, water, and utilities <br />between the four parcels. <br /> <br />2. Rice Creek Watershed District approval. <br /> <br />3. Conformance with the conditions of Planning Case 98-24. <br /> <br />Ms. Randall noted that Staff received confirmation from the Rice Creek Watershed District that <br />the applicant has received approval for this subdivision. <br /> <br />If the Planning Commission makes a recommendation on this Planning Case, it would be heard <br />at the Monday, April 26, 1999, regular meeting of the City Council. <br /> <br />Mr. Bill Sikora, Project Manager, CSM Corporation, stated that he was available to answer any <br />questions the Planning Commission may have. <br />
The URL can be used to link to this page
Your browser does not support the video tag.