Laserfiche WebLink
<br />. <br /> <br />e <br /> <br />. <br /> <br />. <br /> <br />, <br /> <br />CITY OF ARDEN HILLS <br /> <br />MEMORANDUM <br /> <br />DATE: <br /> <br />May 24, 1999 <br /> <br />, <br />.' <br /> <br />TO: <br /> <br />Mayor and City Council/ <br />t;?~ <br />Nancy Randall, Associate pfu6~er/ <br /> <br />FROM: <br /> <br />SUBJECT: <br /> <br />99-07 Planned Unit Development and Master Plan Amendment <br />Cardiac Pacemakers Inc., 4100 Hamline Avenue <br /> <br />Request. The applicant is proposing to update their master plan to include the recent <br />addition between building A and B, future proposed addition to building B, addition to <br />building E, and future parking lots to the north and east (Exhibit A, pages 1 and 2 of 2). <br /> <br />Secondly, the applicant is requesting approval of an amendment to their previously <br />approved Planned Unit Development (Planning Case 97-03) to allow for the expansion of <br />Building E and 221 additional parking spaces at their campus which is located at 4100 <br />Hamline Avenue. The proposed parking is on the east side of Femwood Avenue (Exhibit <br />B). <br /> <br />Background. Building E is primarily research and development. The existing master <br />plan shows expansion to the campus by adding Buildings G and H. These are primarily <br />manufacturing facilities. The applicant is proposing to expand onto Building E due to the <br />growth of the research and development area of the company. The exterior of the <br />proposed addition is designed to match the existing exterior of Building E. <br /> <br />With the expansion of Building E, additional parking is required. The applicant is <br />proposing a 221 stall parking lot, on a separate parcel across F emwood Avenue, to meet the <br />requirements. It is recommended that the applicant establish a permanent easement for <br />parking or show proof of parking on the existing site. The applicant wishes to combine the <br />parcel to the north of Building E with the campus and use the proposed parking lot as proof <br />of parking. As is evident by reviewing the parking capacity after the expansion to Building <br />E (52 "extra" parking spaces), or reviewing the master plan, the need for a parking structure <br />is not too far into the future, given the growth CPI has been experiencing. The applicant <br />and the City will need to be mindful of this fact as future development scenarios are <br />proposed on the CPI campus. <br /> <br />The proposed parking lot across Femwood Avenue may cause for some pedestrian traffic <br />problems. There are currently only two stop signs at this intersection. The north bound <br />traffic does not have to stop. The City will need to evaluate the need for a three way stop at <br />this intersection. <br /> <br />Future Buildings G and H are shown as three story buildings. The Zoning Ordinance in <br />Section V, F, 4, states that the height of a structure in the I-I zoning district shall not <br />exceed 35 feet. If the proposed buildings G and H will be taller then 35 feet in height a <br />