Laserfiche WebLink
<br />r <br /> <br />City of Arden Hills <br />I' <br />~ <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />- <br />1 <br />1 <br />1 <br />1 <br />I <br />I <br />I <br />" <br />I <br /> <br />Chapter 10 Utilities <br /> <br />connected to any sewer connections. If any portion of a house sewer is laid across or over <br /> <br />any existing cesspool or septic tank, the cesspool or septic tank shall first be pumped clean <br /> <br />and filled with earth to the surrounding ground level. Where a connecting sewer is laid <br /> <br />across or over any existing cesspool or septic tank, only Cast Iron Soil Pipe, conforming <br /> <br />to the A.S.T.M. Standard Specification A-74-42, shall be used for that portion of the <br /> <br />connecting sewer which is laid across or over the existing cesspool or septic tank. <br /> <br />Subd. 3 Connections at "Y" Only. Every connecting sewer shall be connected to the <br /> <br />municipal sewer system at the "Y" or sewer connection stubs designated for the property <br /> <br />served by the connection, except where otherwise expressly authorized in writing by the <br /> <br /> <br />plumbing inspector. Connections authorized by the plumbing inspector shall be made only <br /> <br /> <br />under his or her direct supervision and in the manner as he or she may direct. <br /> <br />Subd. 4 Tunneling. Tunneling for distances of not more than six (6) feet shall be <br /> <br /> <br />permissible in yards, courts or driveways of any building site. When pipes are driven, the <br /> <br /> <br />drive pipe shall be at least one size larger than the pipe to be laid. <br /> <br />Subd. 5 Independent Systems. <br /> <br />A. The drainage and plumbing system of each new building and of new work <br /> <br /> <br />installed in an existing building shall be separate from and independent of that of any <br /> <br /> <br />other building' except as provided for in Subparts B and C of this Subsection. <br /> <br />10 . 35 <br />