Laserfiche WebLink
<br />('. <br />I' <br />~ <br />I <br />I <br />1 <br />I <br />1 <br />I <br />- <br />1 <br />I <br />I <br />1 <br />I <br />I <br />I <br />" <br />I <br /> <br />City of Arden Hills <br /> <br />Chapter 10 Utilities <br /> <br />metropolitan disposal system; and <br /> <br />2. Connections, direct and indirect, to the metropolitan disposal system. <br /> <br />B. The charge shall be collected on the basis of building permits issued after <br /> <br /> <br />January 1, 1973, or connection permits issued for connections to be made after <br /> <br /> <br />January 1, 1973, on the following basis: <br /> <br />1. The charge shall be payable on the issuance of each building permit for <br />new construction issued after January 1, 1973. <br /> <br />2. A charge shall be payable on the issuance of a building permit for <br /> <br /> <br />alterations or additions to existing buildings if the alteration or addition will <br /> <br /> <br />require additional reserve capacity, ahd the Service Availability Charge <br /> <br />(SAC) unit shall be determined on the same basis as for new buildings. <br /> <br />C. The charge shall be imposed on sewer connection permits issued after January , <br /> <br />1, 1973, except: <br /> <br />1. Where a SAC unit charge was made when the building permit for the <br />subject building was issued. <br /> <br />10 - 43 <br />