Laserfiche WebLink
<br />City of Arden Hills <br /> <br />Chapter 12 Subdivisions <br /> <br />others. The subdivider as contractor shall furnish a surety bond with penalty equal to 1.25 . <br /> <br />times the cost of the improvements to be made under the contract as estimated by the City <br /> <br />engineer, which bond will be in form required by statute for public contractors bonds and <br /> <br />will identify the improvements and the time schedule for their completion. <br /> <br />1230.05 Utilities. All utilities ~g'be installed underground as provided in sec-liGftS--28-U~ <br /> <br /> <br />tfiroogb-2a-16-1-ef-this Code. All underground work shall be completed prior to street surfacing. <br /> <br />1230.06 Sidewalks. Sidewalks may be required along both sides of all streets; pedestrian ways <br /> <br /> <br />shall be paved and fenced as approved by the City Council. <br /> <br />1230.07 Curb and Gutter. Concrete curb and gutter shall be required. <br /> <br />. <br /> <br />1230.08 On-site Sewers. Where on-site sanitary sewer facilities are proposed to be utilized, soil <br />percolation tests shall be made with the results presented to the City engineer; The engineer shall <br />then present a report thereon to the City Council, which may prohibit the use of individual sewer <br />systems, require larger lot sizes, or otherwise act to protect the public health and welfare. <br /> <br />Section 1240 - Variances and Exemptions <br /> <br />1240.01 General. The City Council may grant a variance from these regulations ~tE::~G.ll <br /> <br />following a finding that all of the following conditions exist: <br /> <br />. <br /> <br />12 - 34 <br />