My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 08-16-1999
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1999
>
CCP 08-16-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:15:35 PM
Creation date
11/13/2006 11:24:18 AM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br /> CITYOFARDEN-HILLS <br /> FIVE.YEAR CAPITAL IMPROVEMENT PLAN <br />DEPARTMENT PROJECT TITLE PROJECT NUMBER FIVE-YEAR COST <br />Public Works Ditch and Pond 482-00+ $175,000 <br /> Maintenance <br /> SCHEDULED PROJECT ACTIVITY <br />FUNDING SOURCE 2000 2001 2002 2003 2004 FUTURE <br />SWM Utility $50,000 $50,000 $25,000 $25,000 $25,000 <br />LOCATION <br />Various ditches identified in the Ditch Maintenance Plan <br />DESCRIPTION <br />Clean stormwater ditches, re-grade ditch bottoms and slopes, and haul out excess material. <br />JUSTIFICATION <br />Many areas of the City ditches are nearly overgrown with vegetation, causing water to leave the ditch <br />banks and enter streets and private property during wet periods. <br />CURRENTSTATUS~ROJECTEDSCHEDULE <br />The City Engineer and Public Works Director studied the ditches in 1998. In May, 1999, the City <br />Engineer issued a Drainage Report that included future maintenance plan recommendations. <br />RELATIONSHIP TO EXISTING PLANS AND OTHER PROGRAMS <br />Part of the Public Works plan to become more pro-active on infrastructure maintenance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.