Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />.-- <br /> . <br /> CITY OF ARDEN HILLS <br /> - <br /> FIVE-YEAR CAPITAL IMPROVEMENT PLAN <br />DEPARTMENT PROJECT TITLE PROJECT NUMBER FIVE-YEAR COST <br />Public Works Misc. SWM 483-00+ $75,000 <br /> Replacement Projects <br /> SCHEDULED PROJECT ACTIVITY <br />FUNDING SOURCE 2000 2001 2002 2003 2004 FUTURE <br />SWM Utility $15,000 $15,000 $15,000 $15,000 $15,000 <br />LOCATION <br />Various locations in the City <br />DESCRIPTION <br />Repair/reconstruct portions of storm drainage systems as needed. <br />JUSTIFICATION <br />Failures in storm drainage system need correction to prevent further damage to streets and <br />surrounding areas. <br />CURRENTSTATUS~ROJECTEDSCHEDULE <br />Have been replacing and reconstructing known failures as time permits. Those in traffic areas are <br />attended to as discovered. Typical failures have been the collapse of approximately five to six catch <br />basins on an annual basis. <br />RELATIONSHIP TO EXISTING PLANS AND OTHER PROGRAMS <br />Part of Public Works' ongoing maintenance. <br />