My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 08-30-1999
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1999
>
CCP 08-30-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:15:38 PM
Creation date
11/13/2006 11:24:41 AM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br />. <br />. <br />. <br /> <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />:. <br /> <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />.. <br />. <br />. <br />. <br /> <br />III BRW <br />EED A DAMES& MOORE-GROUPCOMPANY <br /> <br />David J. Showalter, AICP, AlA <br />Senior Associate, Planning/Urban Design <br /> <br />Experience <br /> <br />Mr, Showalter is a project manager and urban designer with BR W. He is <br />both an architect and city planner with 25 years of design and management <br />experience, with emphasis on downtown revitalization and transit planning <br />and design. Mr. Showalter's project experience includes numerous <br />downtown revitalization and urban design studies, river corridor recreationl <br />transportation studies, and station area and guideway planning for light rail <br />transit and multimodal transportation centers. <br /> <br />Transit and Transportation <br />Design <br /> <br />Major transit and transportation design projects in which Mr. Showalter was <br />project manager or principal designer include: <br /> <br />. 1-66 Corridor Major Investment Study evaluating the potential 10-mile <br />extension of Metro Rail in northern Virginia as a component of future <br />corridor transportation options. Primary tasks involved alignment and <br />starion site selection, site planning and design for intermodaI integra- <br />tion, and identification of joint development site potential, <br />. Station planning and design of pedestrian and streetscape improvements <br />for the construction of downtown Salt Lake City's first segment of its <br />light rail transit system. <br />. Station area planning and design for preliminary engineering of the <br />Newark-Elizabeth Rail Link, a lO-mile, l6-station light rail line and its <br />connection to Newark's existing city subway. Primary tasks involved <br />selecting and evaluating station sites and integrating them with their <br />context, developing intermodaI connections, and developing guidelines <br />for public and private improvements within walking distance of <br />stations. <br />. 1-71 Corridor Major Investment Study evaluating light rail transit <br />options for alignments and station sites along a 36-mile corridor <br />through Cincinnati, OH, and Covington, KY metropolitan areas. <br />. Renovation of the Nicollet Mall Retail and Pedestrian/Transitway in <br />Minneapolis, MN. Bus transit facilities design and pedestrian <br />improvements. <br />. Completion of the West River Parkway Corridor through <br />Minneapolis' Central Riverfront, a three-mile parkway with pedestrian <br />and bicycle trails and creating continuous waterfront park lands <br />connecting downtown with the University of Minnesota campus. <br />. Mr. Showalter has been responsible for the demographic, <br />socioeconomic, and land use components of several 20-year <br />regionallmetropolitan transportation plans. <br /> <br />4lI221B3-TRdoc - (1/99) <br />
The URL can be used to link to this page
Your browser does not support the video tag.