<br />PROJECT COSTS/PROJECT FUNDING
<br />
<br />PROJECT COST SUMMARY
<br />Preliminary construction cost estimates have been prepared for the proposed project. Project
<br />costs shown below include a 10% contingency cost and 26% for administrative costs.
<br />Administrative costs include engineering, planning, legal, fiscal, and city staff expenses. For
<br />comparison purposes, three "packages" of improvements are presented for Council review. The
<br />following is a summary of the estimated project costs for each package:
<br />
<br />Package A - Full Neighborhood Reconstruction, No Pond Construction
<br />
<br />This package includes the reconstruction of all of the streets within the project area to the widths
<br />as described in the Proposed Improvements section and associated watermain improvements. No
<br />ponding or water quality improvements are included in this package.
<br />
<br />Street
<br />Ingerson Road (32')
<br />Cannon Avenue (28')
<br />Fernwood Street (28')
<br />Fernwood Court (24')
<br />Ingerson Court (24')
<br />Carlton Drive (28')
<br />Hamline Avenue (north) (28')
<br />Hamline Avenue (south) (32')
<br />Watermain
<br />Total Estimated Project Cost - Package A
<br />
<br />Storm Sewer
<br />$190,000.00
<br />$34,900.00
<br />$40,300.00
<br />$15,600.00
<br />$0.00
<br />$66,500.00
<br />$15,000.00
<br />$88,600.00
<br />
<br />Total Cost
<br />$773,300.00
<br />$175,800.00
<br />$100,700.00
<br />$ 77,500.00
<br />$ 81,500.00
<br />$364,500.00
<br />$157,300.00
<br />$435,600.00
<br />$ 74.600.00
<br />$2,240,800.00
<br />
<br />Roadway
<br />$583,300.00
<br />$140,900.00
<br />$60,400.00
<br />$61,900.00
<br />$81,500.00
<br />$298,000.00
<br />$142,300.00
<br />$347,000.00
<br />
<br />Package B . Partial Neighborhood Reconstruction, No Pond Construction
<br />
<br />This package is identical to Package A with the exception of Hamline Avenue. It is assumed that
<br />Hamline A venue north of Ingerson would be vacated or would not be reconstructed and that
<br />Hamline A venue south of Ingerson would not be reconstructed at this time and would be
<br />scheduled for reconstruction as State Aid funds are available (earliest construction 2002). As
<br />assumed in Package A, no ponding improvements would be included with this package.
<br />
<br />Street
<br />Ingerson Road (32')
<br />Cannon Avenue (28')
<br />Fernwood Street (28')
<br />Fernwood Court (24')
<br />Ingerson Court (24')
<br />Carlton Drive (28')
<br />Watermain
<br />Total Estimated Project Cost - Package B
<br />
<br />Roadwav
<br />$583,300.00
<br />$140,900.00
<br />$60,400.00
<br />$61,900.00
<br />$81,500.00
<br />$298,000.00
<br />
<br />Storm Sewer
<br />$190,000.00
<br />$34,900.00
<br />$40,300.00
<br />$15,600.00
<br />$0.00
<br />$66,500.00
<br />
<br />Total Cost
<br />$773,300.00
<br />$175,800.00
<br />$100,700.00
<br />$ 77,500.00
<br />$ 81,500.00
<br />$364,500.00
<br />$ 62.000.00
<br />$1,635,300.00