Laserfiche WebLink
<br />I <br />.~ <br />I <br />I <br />I <br />I <br />I <br />i <br />I <br />. <br />I <br />.~ <br />t <br />i <br />I <br />I <br /> <br /> <br />- <br /> <br />PROJECT COSTS/PROJECT FUNDING <br /> <br />PROJECT COST SUMMARY <br />Preliminary construction cost estimates have been prepared for the proposed project. Project <br />costs shown below include a 10% contingency cost and 26% for administrative costs. <br />Administrative costs include engineering, planning, legal, fiscal, and city staff expenses. For <br />comparison purposes, three "packages" of improvements are presented for Council review. The <br />following is a summary of the estimated project costs for each package: <br /> <br />Package A - Full Neighborhood Reconstruction, No Pond Construction <br /> <br />This package includes the reconstruction of all of the streets within the project area to the widths <br />as described in the Proposed Improvements section and associated watermain improvements. No <br />ponding or water quality improvements are included in this package. <br /> <br />Street <br />Ingerson Road (32') <br />Cannon Avenue (28') <br />Fernwood Street (28') <br />Fernwood Court (24') <br />Ingerson Court (24') <br />Carlton Drive (28') <br />Hamline Avenue (north) (28') <br />Hamline Avenue (south) (32') <br />Watermain <br />Total Estimated Project Cost - Package A <br /> <br />Storm Sewer <br />$190,000.00 <br />$34,900.00 <br />$40,300.00 <br />$15,600.00 <br />$0.00 <br />$66,500.00 <br />$15,000.00 <br />$88,600.00 <br /> <br />Total Cost <br />$773,300.00 <br />$175,800.00 <br />$100,700.00 <br />$ 77,500.00 <br />$ 81,500.00 <br />$364,500.00 <br />$157,300.00 <br />$435,600.00 <br />$ 74.600.00 <br />$2,240,800.00 <br /> <br />Roadway <br />$583,300.00 <br />$140,900.00 <br />$60,400.00 <br />$61,900.00 <br />$81,500.00 <br />$298,000.00 <br />$142,300.00 <br />$347,000.00 <br /> <br />Package B . Partial Neighborhood Reconstruction, No Pond Construction <br /> <br />This package is identical to Package A with the exception of Hamline Avenue. It is assumed that <br />Hamline A venue north of Ingerson would be vacated or would not be reconstructed and that <br />Hamline A venue south of Ingerson would not be reconstructed at this time and would be <br />scheduled for reconstruction as State Aid funds are available (earliest construction 2002). As <br />assumed in Package A, no ponding improvements would be included with this package. <br /> <br />Street <br />Ingerson Road (32') <br />Cannon Avenue (28') <br />Fernwood Street (28') <br />Fernwood Court (24') <br />Ingerson Court (24') <br />Carlton Drive (28') <br />Watermain <br />Total Estimated Project Cost - Package B <br /> <br />Roadwav <br />$583,300.00 <br />$140,900.00 <br />$60,400.00 <br />$61,900.00 <br />$81,500.00 <br />$298,000.00 <br /> <br />Storm Sewer <br />$190,000.00 <br />$34,900.00 <br />$40,300.00 <br />$15,600.00 <br />$0.00 <br />$66,500.00 <br /> <br />Total Cost <br />$773,300.00 <br />$175,800.00 <br />$100,700.00 <br />$ 77,500.00 <br />$ 81,500.00 <br />$364,500.00 <br />$ 62.000.00 <br />$1,635,300.00 <br /> <br />8 <br />