Laserfiche WebLink
<br />I <br />~ <br />I <br />I <br />I <br />I <br />I <br />I, <br />I <br />. <br />I <br />I <br />I <br />I <br />I <br />t <br /> <br /> <br />I <br /> <br />Three potential funding scenarios are outlined below based upon the improvements packages <br />outlined above. <br /> <br />Package A - Full Neighborhood Reconstruction, No Pond Construction <br /> <br />Total Estimated Project Cost: $2,240,800.00 <br /> <br />Proposed Funding Sources: <br />General Fund: $200,000.00 (Budgeted for 1999 - West Round Lake Road) <br />General Fund: $240,000.00 (Budgeted for 2000 PMP Program) <br />PIR Fund: $663,161.00 (Assessments @ $57.50/FF) <br />Surface Water Utility $226,100.00 (storm sewer cost minus assessments) <br />Watermain Utility: $ 74,600.00 <br />State Aid: $430.000.00 (Total Estimated 2000 Account Balance) <br />Total $1,833,861.00 <br />Shortage: $406,939.00 (possible funding sources: general fund, advance <br />funding from State Aid account) <br /> <br />Package B -Partial Neighborhood Reconstruction, No Pond Construction <br /> <br />Total Estimated Project Cost: $1,635,300.00 <br /> <br />Proposed Funding Sources: <br />General Fund: $200,000.00 (Budgeted for 1999 - West Round Lake Road) <br />General Fund: $240,000.00 (Budgeted for 2000 PMP Program) <br />PIR Fund: $539,956.00 (Assessments @ $57.50/FF, excluding Hamline Ave) <br />Surface Water Utility $165,354.00 (storm sewer cost minus assessments) <br />Watermain Utility: $ 62,000.00 <br />State Aid $427.990.00 (Advance funding not required) <br />Total: $1,635,300.00 <br />Shortage: $ 0.00 <br /> <br />Package C - Partial Neighborhood Reconstruction, Pond A and Pond B Construction <br /> <br />Total Estimated Project Cost: $1,918,100.00 <br /> <br />Proposed Funding Sources: <br />General Fund: $200,000.00 (Budgeted for 1999 - West Round Lake Road) <br />General Fund: $240,000.00 (Budgeted for 2000 PMP Program) <br />PIR Fund: $539,956.00 (Assessments @ $57.50/FF, excluding Hamline) <br />Surface Water Utility $373,154.00 (Storm sewer + Pond costs) - (Assessments +RCWD) <br />Watermain Utility: $ 62,000.00 <br />RCWD: $ 75,000.00 (Based upon discussions with watershed staff) <br />State Aid: $427.990.00 (Advance funding not required) <br />Total $1,918,100.00 <br />Shortage: $ 0.00 <br /> <br />10 <br />