Laserfiche WebLink
<br />I <br />.It City of Arden Hills <br /> 2000 Street Reconstruction Program <br />I Alternative A <br />I INGERSON COURT CONSTRUCTION <br /> (BASED ON 24' F -F) <br />I Unit <br />No. Item Unit Ouantitv Price Extension <br />I 1 Mobilization LS 1.0 $ 3,100.00 $ 3,100.00 <br /> 2 Bituminous Pavement Removal SY 1,280.0 $ 2.00 $ 2,600.00 <br />I 3 Miscellaneous Removals LS 0.05 $ 20,000.00 $ 1,000.00 <br />4 Common Excavation CY 1,067.0 $ 6.50 $ 6,900.00 <br />I 5 Select Granular Base (12") CY 533.0 $ 12.00 $ 6,400.00 <br />6 Aggregate Base CL 5 (8") CY 356.0 $ 20.00 $ 7,100.00 <br /> 7 Bituminous Base Course (2") TON 147.0 $ 30.00 $ 4,400.00 <br />I 8 Bituminous Wear Course (2") TON 147.0 $ 32.00 $ 4,700.00 <br />9 Bituminous Material for Tack Coat GAL 64.0 $ 1.90 $ 100.00 <br /> 10 Concrete Curb and Gutter (B612) LF 910.0 $ 6.00 $ 5,500.00 <br />It 11 Traffic Control LS 0.05 $ 25,000.00 $ 1,300.00 <br />12 Signage SF 9.0 $ 30.00 $ 300.00 <br />I 13 Sodding SY 2,675.0 $ 3.00 $ 8,000.00 <br />14 Driveway Removal SY 174.0 $ 5.00 $ 900.00 <br /> 15 Bituminous Pavement (Driveway) SY 126.0 $ 25.00 $ 3,200.00 <br />I 16 Concrete Pavement (Driveway) SY 78.0 $ 40.00 $ 3,100.00 <br />17 Sawing Concrete Pavement LF 16.0 $ 5.00 $ 100.00 <br /> 18 Sawing Bituminous Pavement LF 46.0 $ 2.00 $ 100.00 <br />I 10% Contingency $ 5,900.00 <br />I SUBTOTAL $ 64,700.00 <br /> 26% Indirect Cost and Capitalized Interest $ 16,800.00 <br />i <br />I Total Estimated Project Cost - $ 81,500.00 <br /> <br /> <br />I <br />