My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 11-08-1999
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1999
>
CCP 11-08-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:15:43 PM
Creation date
11/13/2006 11:27:31 AM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br /> <br /> City of Arden Hills <br /> 2000 Street Reconstruction Program <br /> Alternative A <br />I FERNWOOD STREET CONSTRUCTION <br /> (BASED ON 28' F-F) <br />I Unit <br /> No. Item Unit Quantity Price Extension <br />I 1 Mobilization LS 1.0 $ 2,300.00 $ 2,300.00 <br /> 2 Bituminous Pavement Removal SY 1,050.0 $ 2.00 $ 2,100.00 <br />I 3 Miscellaneous Removals LS 0.1 $ 20,000.00 $ 2,000.00 <br />4 Common Excavation CY 793.0 $ 6.50 $ 5,200.00 <br />I 5 Select Granular Base (12") CY 397.0 $ 12.00 $ 4,800.00 <br />6 Aggregate Base CL 5 (8") CY 264.0 $ 14.00 $ 3,700.00 <br /> 7 Bituminous Base Course (2") TON 115.0 $ 30.00 $ 3,500.00 <br />I 8 Bituminous Wear Course (2") TON 115.0 $ 32.00 $ 3,700.00 <br />9 Bituminous Material for Tack Coat GAL 50.0 $ 1.90 $ 100.00 <br /> 10 Concrete Curb and Gutter (B618) LF 640.0 $ 8.00 $ 5,100.00 <br />It 11 Traffic Control LS 0.1 $ 25,000.00 $ 2,500.00 <br />12 Signage SF 18.0 $ 30.00 $ 500.00 <br />I 13 Sodding SY 1,410.0 $ 3.00 $ 4,200.00 <br />14 Driveway Removal SY 68.0 $ 5.00 $ 300.00 <br /> 15 Bituminous Pavement (Driveway) SY 40.0 $ 25.00 $ 1,000.00 <br />I 16 Concrete Pavement (Driveway) SY 58.0 $ 40.00 $ 2,300.00 <br />17 Sawing Concrete Pavement LF 10.0 $ 5.00 $ 100.00 <br /> 18 Sawing Bituminous Pavement LF 24.0 $ 2.00 $ 100.00 <br />I 10% Contingency $ 4,400.00 <br />I SUBTOTAL $ 47,900.00 <br /> 26% Indirect Cost and Capitalized Interest $ 12,500.00 <br />I <br />I Total Estimated Project Cost - $ 60,400.00 <br /> <br /> <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.