My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 11-08-1999
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1999
>
CCP 11-08-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:15:43 PM
Creation date
11/13/2006 11:27:31 AM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br /> <br /> City of Arden Hills <br /> 2000 Street Reconstruction Program <br /> Alternative A <br />I FERNWOOD COURT CONSTRUCTION <br /> (BASED ON 24' F-F) <br />I Unit <br /> No. Item Unit Ouantitv Price Extension <br />I 1 Mobilization LS 1.00 $ 2,400.00 $ 2,400.00 <br /> 2 Bituminous Pavement Removal SY 950.00 $ 2.00 $ 1,900.00 <br />I 3 Miscellaneous Removals LS 0.05 $ 20,000.00 $ 1,000.00 <br />4 Common Excavation CY 816.00 $ 6.50 $ 5,300.00 <br />I 5 Select Granular Base (12") CY 457.00 $ 12.00 $ 5,500.00 <br />6 Aggregate Base CL 5 (8") CY 304.00 $ 20.00 $ 6,100.00 <br /> 7 Bituminous Base Course (2") TON 110.00 $ 30.00 $ 3,300.00 <br />I 8 Bituminous Wear Course (2") TON 110.00 $ 32.00 $ 3,500.00 <br />9 Bituminous Material for Tack Coat GAL 48.00 $ 1.90 $ 100.00 <br /> 10 Concrete Curb and Gutter (B612) LF 655.00 $ 6.00 $ 3,900.00 <br />. 11 Traffic Control LS 0.05 $ 25,000.00 $ 1,300.00 <br />12 Signage SF 9.00 $ 30.00 $ 300.00 <br />I 13 Sodding SY 1,615.00 $ 3.00 $ 4,800.00 <br />14 Driveway Removal SY 95.00 $ 5.00 $ 500.00 <br />15 Bituminous Pavement (Driveway) SY 134.00 $ 25.00 $ 3,400.00 <br />I 16 Concrete Pavement (Driveway) SY 30.00 $ 40.00 $ 1 ,200.00 <br />17 Sawing Bituminous Pavement LF 32.00 $ 2.00 $ 100.00 <br />I 10% Contingency $ 4,500.00 <br />I SUBTOTAL $ 49,100.00 <br /> 26% Indirect Cost and Capitalized Interest $ 12,800.00 <br />I <br /> Total Estimated Project Cost - Roadway Alternative A $ 61,900.00 <br />I <br /> <br /> <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.