Laserfiche WebLink
<br />I <br /> <br /> City of Arden Hills <br /> 2000 Street Reconstruction Program <br /> Alternative A <br />I FERNWOOD COURT CONSTRUCTION <br /> (BASED ON 24' F-F) <br />I Unit <br /> No. Item Unit Ouantitv Price Extension <br />I 1 Mobilization LS 1.00 $ 2,400.00 $ 2,400.00 <br /> 2 Bituminous Pavement Removal SY 950.00 $ 2.00 $ 1,900.00 <br />I 3 Miscellaneous Removals LS 0.05 $ 20,000.00 $ 1,000.00 <br />4 Common Excavation CY 816.00 $ 6.50 $ 5,300.00 <br />I 5 Select Granular Base (12") CY 457.00 $ 12.00 $ 5,500.00 <br />6 Aggregate Base CL 5 (8") CY 304.00 $ 20.00 $ 6,100.00 <br /> 7 Bituminous Base Course (2") TON 110.00 $ 30.00 $ 3,300.00 <br />I 8 Bituminous Wear Course (2") TON 110.00 $ 32.00 $ 3,500.00 <br />9 Bituminous Material for Tack Coat GAL 48.00 $ 1.90 $ 100.00 <br /> 10 Concrete Curb and Gutter (B612) LF 655.00 $ 6.00 $ 3,900.00 <br />. 11 Traffic Control LS 0.05 $ 25,000.00 $ 1,300.00 <br />12 Signage SF 9.00 $ 30.00 $ 300.00 <br />I 13 Sodding SY 1,615.00 $ 3.00 $ 4,800.00 <br />14 Driveway Removal SY 95.00 $ 5.00 $ 500.00 <br />15 Bituminous Pavement (Driveway) SY 134.00 $ 25.00 $ 3,400.00 <br />I 16 Concrete Pavement (Driveway) SY 30.00 $ 40.00 $ 1 ,200.00 <br />17 Sawing Bituminous Pavement LF 32.00 $ 2.00 $ 100.00 <br />I 10% Contingency $ 4,500.00 <br />I SUBTOTAL $ 49,100.00 <br /> 26% Indirect Cost and Capitalized Interest $ 12,800.00 <br />I <br /> Total Estimated Project Cost - Roadway Alternative A $ 61,900.00 <br />I <br /> <br /> <br /> <br />I <br />