Laserfiche WebLink
<br />I <br /> <br /> City of Arden Hills <br /> 2000 Street Reconstruction Program <br /> Alternative A <br />I HAMLINE FRONTAGE ROAD CONSTRUCTION <br /> (INGERSON ROAD TO TILLER LANE) <br />I (BASED ON 28' F-F) <br /> Unit <br />I No. Item Unit Ouantitv Price Extension <br /> 1 Mobilization LS 1.0 $ 5,350.00 $ 5,400.00 <br />I 2 Bituminous Pavement Removal SY 1,500.0 $ 2.00 $ 3,000.00 <br />3 Miscellaneous Removals LS 0.05 $ 20,000.00 $ 1,000.00 <br />I 4 Common Excavation CY 3,068.0 $ 6.50 $ 19,900.00 <br />5 Select Granular Base (36") CY 2,300.0 $ 12.00 $ 27,600.00 <br /> 6 Geotextile Fabric SY 1,500.0 $ 2.00 $ 3,000.00 <br />I 7 Aggregate Base CL 5 (8") CY 511.0 $ 20.00 $ 10,200.00 <br />8 Bituminous Base Course (2") TON 220.0 $ 30.00 $ 6,600.00 <br /> 9 Bituminous Wear Course (2") TON 220.0 $ 32.00 $ 7,000.00 <br />It 10 Bituminous Material for Tack Coat GAL 100.0 $ 1.90 $ 200.00 <br />11 Concrete Curb and Gutter (B618) LF 1,210.0 $ 8.00 $ 9,700.00 <br />I 12 Traffic Control LS 0.05 $ 25,000.00 $ 1,300.00 <br />13 Signage SF 18.0 $ 30.00 $ 500.00 <br /> 14 Sodding SY 2,030.0 $ 3.00 $ 6,100.00 <br />I 15 Driveway Removal SY 31.0 $ 5.00 $ 200.00 <br />16 Bituminous Pavement (Driveway) SY 31.0 $ 25.00 $ 800.00 <br /> 17 Sawing Bituminous Pavement LF 12.0 $ 2.00 $ 100.00 <br />I 10% Contingency $ 10,300.00 <br />I SUBTOTAL $ 112,900.00 <br /> 26% Indirect Cost and Capitalized Interest $ 29,400.00 <br />I <br />I Total Estimated Project Cost - $ 142,300.00 <br /> <br /> <br /> <br />I <br />