My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 11-08-1999
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1999
>
CCP 11-08-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:15:43 PM
Creation date
11/13/2006 11:27:31 AM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />.1- City of Arden Hills <br /> 2000 Street Reconstruction Program <br />I Alternative A <br />I CARLTON DRIVE CONSTRUCTION <br /> (BASED ON 28' F-F) <br />I Unit <br />No. Item Unit Quantitv Price Extension <br />I 1 Mobilization LS 1.0 $ 11,200.00 $ 11,200.00 <br /> 2 Bituminous Pavement Removal SY 5,120.0 $ 2.00 $ 10,200.00 <br />I 3 Miscellaneous Removals LS 0.2 $ 20,000.00 $ 4,000.00 <br />4 Common Excavation CY 3,868.0 $ 6.50 $ 25,100.00 <br /> 5 Select Granular Base (12") CY 1,934.0 $ 12.00 $ 23,200.00 <br />I 6 Aggregate Base CL 5 (8") CY 1,290.0 $ 20.00 $ 25,800.00 <br />7 Bituminous Base Course (2") TON 550.0 $ 30.00 $ 16,500.00 <br />I 8 Bituminous Wear Course (2") TON 550.0 $ 32.00 $ 17,600.00 <br />9 Bituminous Material for Tack Coat GAL 240.0 $ 1.90 $ 500.00 <br /> 10 Concrete Curb and Gutter (B618) LF 3,070.0 $ 8.00 $ 24,600.00 <br />-- 11 Traffic Control LS 0.2 $ 25,000.00 $ 5,000.00 <br />12 Sign age SF 36.0 $ 30.00 $ 1,100.00 <br /> 13 Sodding SY 5,150.0 $ 3.00 $ 15,500.00 <br />I 14 Driveway Removal SY 623.0 $ 5.00 $ 3,100.00 <br />15 Bituminous Pavement (Driveway) SY 213.0 $ 25.00 $ 5,300.00 <br />I 16 Concrete Pavement (Driveway) SY 620.0 $ 40.00 $ 24,800.00 <br />17 Sawing Concrete Pavement LF 246.0 $ 5.00 $ 1,200.00 <br /> 18 Sawing Bituminous Pavement LF 128.0 $ 2.00 $ 300.00 <br />, 10% Contingency $ 21,500.00 <br />I SUBTOTAL $ 236,500.00 <br /> 26% Indirect Cost and Capitalized Interest $ 61,500.00 <br />I <br />I Total Estimated Project Cost - $ 298,000.00 <br /> <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.