Laserfiche WebLink
<br />I <br />I City of Arden Hills <br />. <br /> 2000 Street Reconstruction Program <br />I <br /> INGERSON ROAD CONSTRUCTION <br />I (BASED ON 32' F-F) <br />I Unit <br />No. Item Unit Ouantity Price Extension <br />I 1 Mobilization LS 1.0 $ 21,500.00 $ 21,500.00 <br />2 Bituminous Pavement Removal SY 7,723.0 $ 2.00 $ 15,400.00 <br />I 3 Clearing and Grubbing TREE 4.0 $ 500.00 $ 2,000.00 <br />4 Miscellaneous Removals LS 0.3 $ 20,000.00 $ 6,000.00 <br />5 Common Excavation CY 8,454.0 $ 6.50 $ 55,000.00 <br />I 6 Select Granular Base (12") CY 3,623.0 $ 12.00 $ 43,500.00 <br />7 Aggregate Base CL 5 (12") CY 3,623.0 $ 20.00 $ 72,500.00 <br /> 8 Bituminous Base Course (2") TON 1,053.0 $ 30.00 $ 31,600.00 <br />I 9 Bituminous Wear Course (2") TON 1,053.0 $ 32.00 $ 33,700.00 <br />10 Bituminous Material for Tack Coat GAL 460.0 $ 1.90 $ 900.00 <br />.. 11 Concrete Curb and Gutter (B618) LF 5,160.0 $ 8.00 $ 41,300.00 <br />12 Traffic Control LS 0.3 $ 25,000.00 $ 7,500.00 <br /> 13 Signage SF 80.0 $ 30.00 $ 2,400.00 <br />1 14 Striping LF 1,000.0 $ 0.50 $ 500.00 <br />15 Sodding SY 10,700.0 $ 3.00 $ 32,100.00 <br /> 16 Driveway Removal SY 1,293.0 $ 5.00 $ 6,500.00 <br />I 17 Bituminous Pavement (Driveway) SY 875.0 $ 25.00 $ 21,900.00 <br />18 Concrete Pavement (Driveway) SY 618.0 $ 40.00 $ 24,700.00 <br />I 19 Sawing Concrete Pavement LF 198.0 $ 5.00 $ 1,000.00 <br />20 Sawing Bituminous Pavement LF 415.0 $ 2.00 $ 800.00 <br />I 10% Contingency $ 42,100.00 <br />l SUBTOTAL $ 462,900.00 <br /> 26% Indirect Cost and Capitalized Interest $ 120,400.00 <br />I Total Estimated Project Cost - $ 583,300.00 <br />I. <br />t <br />I <br />