Laserfiche WebLink
<br />I <br />I. <br />I <br />.' <br />J <br />I No. <br />t 1 <br />2 <br />I 3 <br />4 <br />5 <br />, 6 <br />7 <br /> 8 <br />I 9 <br />10 <br />I. ~~ <br /> 13 <br />1 14 <br />15 <br /> 16 <br />I 17 <br />18 <br />I <br />I <br />i <br />I <br />I <br />1. <br />I <br /> <br /> City of Arden Hills <br /> 2000 Street Reconstruction Program <br /> INGERSON COURT CONSTRUCTION <br /> (BASED ON 32' F-F) <br /> Unit <br /> Item Unit Ouantitv Price Extension <br />Mobilization LS 1.0 $ 3,200.00 $ 3,200.00 <br />Bituminous Pavement Removal SY 1,280.0 $ 2.00 $ 2,600.00 <br />Miscellaneous Removals LS 0.05 $ 20,000.00 $ 1,000.00 <br />Common Excavation CY 1,351.0 $ 6.50 $ 8,800.00 <br />Select Granular Base (12") CY 676.0 $ 12.00 $ 8,100.00 <br />Aggregate Base CL 5 (8") CY 450.0 $ 20.00 $ 9,000.00 <br />Bituminous Base Course (2") TON 196.0 $ 30.00 $ 5,900.00 <br />Bituminous Wear Course (2") TON 196.0 $ 32.00 $ 6,300.00 <br />Bituminous Material for Tack Coat GAL 85.0 $ 1.90 $ 200.00 <br />Concrete Curb and Gutter (B612) LF 910.0 $ 6.00 $ 5,500.00 <br />Traffic Control LS 0.05 $ 25,000.00 $ 1,300.00 <br />Signage SF 9.0 $ 30.00 $ 300.00 <br />Sodding SY 2,675.0 $ 3.00 $ 8,000.00 <br />Driveway Removal SY 174.0 $ 5.00 $ 900.00 <br />Bituminous Pavement (Driveway) SY 126.0 $ 25.00 $ 3,200.00 <br />Concrete Pavement (Driveway) SY 78.0 $ 40.00 $ 3,100.00 <br />Sawing Concrete Pavement LF 16.0 $ 5.00 $ 100.00 <br />Sawing Bituminous Pavement LF 46.0 $ 2.00 $ 100.00 <br />10% Contingency $ 6,800.00 <br />SUBTOTAL $ 74,400.00 <br />26% Indirect Cost and Capitalized Interest $ 19,300.00 <br /> <br />Total Estimated Project Cost - <br /> <br />$ 93,700.00 <br />