Laserfiche WebLink
<br />I <br />I. <br />I <br />I <br />I No. <br />1 <br />I 2 <br />3 <br /> 4 <br />I 5 <br />6 <br /> 7 <br />I 8 <br />9 <br />I 10 <br />11 <br /> 12 <br />1.13 <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I. <br />I <br /> <br />City of Arden Hills <br />2000 Street Reconstruction Program <br />TILLER LANE CUL-DE-SAC CONSTRUCTION <br /> Unit <br />Item Unit Quantity Price Extension <br />Mobilization LS 1.0 $ 2,500.00 $ 2,500.00 <br />Bituminous Pavement Removal SY 492.0 $ 2.00 $ 1,000.00 <br />Miscellaneous Removals LS 0.05 $ 20,000.00 $ 1,000.00 <br />Common Excavation CY 654.0 $ 6.50 $ 4,300.00 <br />Select Granular Base (12") CY 327.0 $ 12.00 $ 3,900.00 <br />Aggregate Base CL 5 (8") CY 218.0 $ 20.00 $ 4,400.00 <br />Bituminous Base Course (2") TON 57.0 $ 30.00 $ 1,700.00 <br />Bituminous Wear Course (2") TON 57.0 $ 32.00 $ 1,800.00 <br />Bituminous Material for Tack Coat GAL 25.0 $ 1.90 $ 100.00 <br />Concrete Curb and Gutter (B618) LF 350.0 $ 8.00 $ 2,800.00 <br />Traffic Control LS 0.05 $ 25,000.00 $ 1,300.00 <br />Retaining Wall LS 1.00 $ 15,000.00 $ 15,000.00 <br />Sodding SY 2,100.0 $ 3.00 $ 6,300.00 <br />10% Contingency $ 4,600.00 <br />SUBTOTAL $ 50,700.00 <br />26% Indirect Cost and Capitalized Interest $ 13,200.00 <br /> <br />Total Estimated Project Cost - <br /> <br />$ 63,900.00 <br />