Laserfiche WebLink
<br />I <br />'. City of Arden Hills <br />I 2000 Street Reconstruction Program <br /> HAMLINE FRONTAGE ROAD CONSTRUCTION <br />I (INGERSON ROAD TO TILLER LANE) <br /> (BASED ON 32' F-F) <br />I Unit <br /> No. Item Unit Ouantitv Price Extension <br />I 1 Mobilization LS 1.0 $ 5,300.00 $ 5,300.00 <br />I 2 Bituminous Pavement Removal SY 1,500.0 $ 2.00 $ 3,000.00 <br />3 Miscellaneous Removals LS 0.05 $ 20,000.00 $ 1,000.00 <br /> 4 Common Excavation CY 3,428.0 $ 6.50 $ 22,300.00 <br />I 5 Select Granular Base (36") CY 2,571.0 $ 12.00 $ 30,900.00 <br />6 Geotextile Fabric SY 1,500.0 $ 2.00 $ 3,000.00 <br /> 7 Aggregate Base CL 5 (8") CY 571.0 $ 20.00 $ 11,400.00 <br />I 8 Bituminous Base Course (2") TON 249.0 $ 30.00 $ 7,500.00 <br />9 Bituminous Wear Course (2") TON 249.0 $ 32.00 $ 8,000.00 <br />I. 10 Bituminous Material for Tack Coat GAL 108.0 $ 1.90 $ 200.00 <br />11 Concrete Curb and Gutter (B618) LF 1,210.0 $ 8.00 $ 9,700.00 <br /> 12 Traffic Control LS 0.05 $ 25,000.00 $ 1,300.00 <br />I 13 Signage SF 18.0 $ 30.00 $ 500.00 <br />14 Sodding SY 2,030.0 $ 3.00 $ 6,100.00 <br /> 15 Driveway Removal SY 31.0 $ 5.00 $ 200.00 <br />I 16 Bituminous Pavement (Driveway) SY 31.0 $ 25.00 $ 800.00 <br />17 Sawing Bituminous Pavement LF 12.0 $ 2.00 $ 100.00 <br />I 10% Contingency $ 11,100.00 <br />I SUBTOTAL $ 122,400.00 <br /> 26% Indirect Cost and Capitalized Interest $ 31,800.00 <br />I <br /> Total Estimated Project Cost - $ 154,200.00 <br />I <br />I <br />I. <br />I <br /> ----.- -- <br />