Laserfiche WebLink
<br />I <br /> <br />.. <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />.. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />.. <br />I <br /> <br />I <br /> <br />and <br /> <br />landscaped and generally made an attractive neighbor and community asset. New, reinforced storage bunkers would <br />also help assure other investors that the operation is generally safe (especially given the site's long safety record). <br /> <br />OfficelIndustrial: This is the only plan that shows a use pad that essentially accommodates Alliant Tech's existing <br />building: the office/commercial area north of County H extended. The new entrance roadway could be curved <br />slightly more to the south to leave Building 103 fully intact, with a small buffer space. This plan also contains the <br />largest number of sites to which Alliant might reasonably move. Overall rating: Fair <br /> <br />Town Center: The area designated for a town center could retain Building 103 in the near term. However, in the <br />long term, retention of Building 103 would eliminate any possibility ofactually developing a real town center at this <br />location. The company could relocate to the west or south, although these areas are designated for office/related <br />uses of a less intense character, or to the special opportunity site. Overall rating: Fair <br /> <br />Open Space: County H extended, which would serve as the principal collector on the site in this scenario, would <br />run through Alliant Tech's present building. Again, the company could relocate to the west or south or to the special <br />opportunity site. Overall rating: Poor <br /> <br />Residential: The intersection of County H extended and the other principal on-site collector would be located <br />within the Building 103 footpriot. Also, the number of site opportunities for relocating Alliant Tech has decreased, <br />although the special opportunity site is still a possibility. Overall rating: Poor <br /> <br />Fiscal and Financial Impacts <br /> <br />FCl Will the development scheme he a net drain on or a net contributor to local taxing jurisdictions? <br /> <br />Indicators <br />. Extent of the tax base (revenues) provided for by uses in the plan. <br />. Extent of the services (expenditures) demanded by uses in the plan. <br /> <br />OfficeJIndustrial: At full buildout, this plan contains enough space to accommodate $1.1 billion in non-residential <br />development, with a total tax capacity of about $50 million. This development would generate $8.9 million for the <br />City of Arden Hills, as well as $56 million for the other two local taxing jurisdictions. Housing on the site would <br />contribute another $1.3 million to the City and $8 million to the county and school district. <br /> <br />Town Center: At full buildout, this plan would accommodate $469 million of non-residential development that <br />would generate $3.7 million for the City and about $23 million for the other jurisdictions. Housing would contribute <br />another $922,000 to the City and nearly $6 million to the county and school district. <br /> <br />Open Space: At full buildout, this plan would hold about $220 million in non-residential development, excluding <br />the sports complex. (Because of uncertainties as to how that complex might be developed, it was assigned a zero <br />value.) This development would generate nearly $1.7 million for the City and more than $10 million for the county <br />and school district. Housing would make a smaller contribution: $270,000 to the City, about $1.7 million total to the <br />others. <br /> <br />Residential: At full buildout, this plan would hold about $260 million in non-residential develop-ment, generating <br />more than $2 million in City taxes and $13 million in taxes for the other juris-dictions. Housing would contribute <br />another $1.7 million to the City and more than $10 million to the county and school district. <br /> <br />Camiros, Ltd./SEH, Inc.lLHDL, Ltd. <br /> <br />TCAAP Framework Plan <br />Page 21 <br /> <br />Chapter IV <br />