My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 03-13-2000
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2000
>
CCP 03-13-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:15:59 PM
Creation date
11/13/2006 1:23:35 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ARDEN HILLS JOINT CITY COUNCIL/PLANNING COMMISSION <br />WORKSESSION FEBRUARY 22, 2000 <br /> <br />DRAFT <br /> <br />. <br /> <br />Staff was directed to review, with the architect and consultant, the City Council <br />Chambers audio/visual design and related budget, and provide recommendations for the <br />March Worksession. <br /> <br />2. Sewer and Water Connection <br /> <br />City Administrator Lynch advised Councilmembers that the sewer and water cOillleetion <br />was not originally bid as part of the City Hall construction project. Mr. Lynch and Public <br />Works Director Stafford were recommending that the Council authorize the City <br />Engineer to prepare plans and specifications for this connection. <br /> <br />Mr. Stafford reviewed the projected costs and indicated that it would cost an additional <br />$8,000 for the water main service to City Hall if a twelve inch line is installed for future <br />cross connection with the City of Shoreview, he suggested that the City consider an <br />agreement with the City of Shore view for an emergency water connection as part of the <br />City Hall construction project. <br /> <br />Staff was directed to include the water and sewer connection, and related emergency <br />water cross- connection with the City of Shoreview, with the original City Hall <br />construction bid package. <br /> <br />b. <br /> <br />Metropolitan Council Presentation, Metro Transit Restructuring <br />Study/Service Plan <br /> <br />. <br /> <br />Representatives of the Metropolitan Council's Metro Transit office, Adam Harrington <br />and Randy Rosevall were introduced by City Administrator Lynch, and proceeded to <br />review the Metro Transit Restructuring Study, Sectors I and 2, Volume II: Service Plan, <br />anticipated to begin operation in September, 2000. Additional implementation is <br />scheduled for 2001, increasing the frequency of service for the Arden Hills area. <br /> <br />Discussion items included current and proposed ridership numbers, schedules and routes; <br />Bethel and Northwestern College usage and potential alleviation of parking problems; <br />implications of current and proposed service; outdated demographic information for the <br />Roseville Circulator; additional "Park and Ride" sites; and federal funding requirements. <br /> <br />Councilmembers were requested to forward their comments to staff, and staff was <br />directed to draft a resolution for formal Council action at their February 28, 2000 regular <br />Council meeting, reflecting the City's comments on the study including those regarding <br />the Metro Transit's consideration of an additional route to serve the Bethel College area. <br />Staff was further directed, upon adoption of the resolution by the City Council, to provide <br />a copy of the resolution to Ramsey County. <br /> <br />c. Future Land Use Discussion as Proposed by Vento Re-Use Committee and <br />Comprehensive Plan Update (Joint Worksession with Planning Commission) <br /> <br />-- <br /> <br />-- <br />
The URL can be used to link to this page
Your browser does not support the video tag.