Laserfiche WebLink
<br />I <br /> <br />.. <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br /> <br />I <br /> <br />~. <br />p <br />~.. ~ <br />..~ <br />~ <br /> <br />PUBLIC WORKS/PARKS AND RECREATION <br />SPACE NEEDS STUDY <br /> <br />IV. PROBABLE CONSTRUCTION COST <br /> <br />MAIN BUILDING <br /> <br />It is estimated that the probable construction cost of a new consolidated <br />facility and associated improvements on a hypothetical site of 6.5 acres <br />would be approximately $3.6 million, with $2.6 allocated for the main <br />building, and $1.0 million for site improvement and other aspects of the <br />project. The sand/salt shelter and two storage buildings account for <br />nearly 45% of the site development cost. <br /> <br />The building as depicted by the schematic plan (Figure 1) and also as <br />shown on the report cover and is essentially a single story structure. The <br />following characteristics of the building were assumed as a basis for the <br />cost estimate: <br /> <br />. Building and site present handsome images as viewed from public <br />highway serving site. <br /> <br />. Architectural precast (if approved by the City Council), or brick, is <br />the primary exterior material. <br /> <br />. Roofs are essentially flat with a minimum 1/4" slope. <br /> <br />. Structurally clear spand spaces will be used for maximizing <br />flexibility when practical. <br /> <br />. Extensive areas of exterior windows and skylights will create a very <br />open building with day lighting opportunities. <br /> <br />. Energy efficiency and functional spaces will be the guiding design <br />principle. <br /> <br />. All work areas, except maintenance, should be fully air.conditioned. <br /> <br />. State of the art technology will be incorporated into the deSign. <br /> <br />. Design will offer flexibility for future expansion. <br /> <br />. Office and other peop Ie oriented space will be consistent with the <br />standard of quality evident in other recently constructed city <br />buildings as per City guidelines. <br /> <br />COST SUMMARY <br /> <br />Building <br />Site Development <br />Subtotal <br /> <br />$2.6 Million <br />1.0 Million <br />$3.6 Million <br /> <br />Costs are based on year 2000 dollars. We suggest 3% increase per year <br />for future implementation. Costs include all built.in equipment and <br />systems, including furnishings in office area ($lO/SF Allowance). Items <br />that are not included are portable equipment, computer, <br />telecommunications, professional costs, testing, etc. <br /> <br />TKDA <br /> <br />ENGINEERS -ARCHITECTS. PLAN N ERS <br /> <br />TOLTZ, KING, DUVALL, ANDERSON & ASSOCIATES, INC. <br />