Laserfiche WebLink
<br />I <br />~ <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />. <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />I <br /> <br />Arden Hills <br />Space Needs Study <br /> <br />TABLE IV.1 <br />ESTIMATE OF PROBABLE CONSTRUCTION COST <br />MAIN BUILDING <br />ARDEN HILLS PUBLIC WORKS SPACE NEEDS STUDY <br /> <br />DEPARTMENTfDIVISION <br /> <br />A. Administration <br /> <br />B. Snpport <br /> <br />c. Vehide Maintenance <br />Vehicle Hoists <br />Bridge Crane <br /> <br />D. Shops <br /> <br />E. Vehide Storage <br /> <br />BUILDING SUB- TOTAL: <br /> <br />15% Contingency: <br />BUILDING TOTAL: <br /> <br />ROUNDED UP TOTAL: <br /> <br />* Includes $1O/SF allowance for furnishings. <br />** Average $/SF <br /> <br />TKDA <br /> <br /> COLOR <br /> COST CODE <br />SF AREA $/SF Total <br />1,474 $105 $154,770 * <br />3,232 @ $90 = $290.880 * <br />6.933 @ $75 = $519,975 * <br />2 @ $25,000 = $50,000 <br />l@ $40,000 = $40,000 <br />3,658 @ $75 = $274,350 * <br />14,690 @ $65 = $954,850 <br /> <br />29,987 <br /> <br />$76 ** <br /> <br />$2,284,825 <br /> <br />$342,724 <br />$2,627,549 <br /> <br />$2.6 million <br /> <br /> <br /> <br /> <br /> <br />11932 <br />