My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 03-20-2000
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2000
>
CCP 03-20-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:16:00 PM
Creation date
11/13/2006 1:23:49 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />,. <br />I <br />I <br />I <br />I <br />I <br />I <br />It <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />, <br />I <br /> <br /> <br />II. ARCHITECTURAL PROGRAM <br /> <br />The following is a summary (Table ILl) of the area requirements for <br />the Main Building, unheated storage facilities and site functions. <br /> <br />SUMMARY OF SPACE <br />REQUIREMENTS <br /> <br />TABLE II.1 <br /> <br />SPACE TYPE <br /> <br />SQUARE FEET REQUIRED <br /> <br />. Building Area. Heated <br />. Building Area. Cold <br />. Salt/Sand Storage <br />. Site Area <br />Subtotal <br />'Site Growth Contingency (20%) <br />Total Site Area (SF) <br />Total Site Area (Acres) <br /> <br />29,987 <br />4,200 <br />10,500 <br />189,350 <br />234,037 <br />46,807 <br />280,844 <br />6.45 <br /> <br />'Carried forward from 1992 Report to provide for future expandability <br />and flexibility. <br /> <br />JOINT USAGE <br /> <br />It is possible that other agencies or groups could partlclpate in <br />consolidation into a single location with the City of Arden Hills <br />Maintenance Services Facility. This will provide opportunities for <br />sharing initial construction costs as well as operational costs. <br />Synergies achieved by consolidation with compatible groups include <br />sharing of cost, space, equipment and possibly personneL <br /> <br />To date, two other groups have initiated Space Needs Studies with <br />TKDA to identify their individual requirements for a building and/or <br />site. The two groups are: <br /> <br />. Ramsey County Soil and Water Conservation <br />. Ramsey County Public Works <br /> <br />Ramsey County is currently considering the area (35 acres) just <br />north of Highway 96 and west of Hamline Avenue. Other groups, <br />which we understand have expressed interest in a joint use facility, <br />are: <br /> <br />. National Guard <br />. School District 621 <br />. Ramsey County Sheriffs Department <br />. Mn/DOT <br /> <br />TKDA <br /> <br />ENGINEERS .ARCHITECTS. PLAN N ERS <br /> <br />TOLTZ, KING, DUVALL, ANDERSON & ASSOCIATES, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.