Laserfiche WebLink
<br />e <br /> <br />1999 Public Works in Review <br />Page 3 <br />March 10, 2000 <br /> <br />. North Water Tower <br />The City's north water tower was inspected by ABC Engineering in 1999, and found <br />to be in good condition. A written report is expected soon, ABC specializes in water <br />tower inspection and engineering, <br /> <br />. Water Main Flushing <br />All of the City's water mains were flushed in October, as they will be each year, <br /> <br />Storm Drainal!e <br />. Catch Basins <br />The City continues to experience problems with the collapsing of poorly constructed <br />catch basins, resulting in sinkholes around them, Public Works crews rebuilt <br />approximately six of these in 1999, using pre-cast concrete structures wherever <br />possible, <br /> <br />e <br /> <br />. Drainage Ditches <br />The City engineer provided the City with a map of the City storm drainage <br />infrastructure that identified problem areas in the system, The highest priority <br />problem was a ditch in the McClung neighborhood, which was contract cleaned and <br />regraded in 1999, Some culvert repairs and a new pond skimmer were part of this <br />project, which is completed except for minor punch list items, <br /> <br />. Pipe Failures <br />Public Works crews corrected several pipe failures identified in the storm drainage <br />report, <br /> <br />. Grit Chambers <br />Each of the City's four grit chambers was cleaned last fall using the City's new <br />Vactor machine, These grit chambers will be monitored and cleaned at least <br />annually, <br /> <br />e <br /> <br />ElIuinment <br />. New Generator <br />The City purchased a new 100 KW Caterpillar generator, capable of powering any of <br />the City's fourteen lift stations in the event of power outages, This compliments the <br />1970's vintage generator the City already owned, The new generator came just in <br />time as all fourteen stations were without power on one occasion and eight or more <br />stations were without power on two other occasions in 1999, In these instances the <br />old generator is setup at the City's busiest lift station on Ingerson Road and Hamline <br />Avenue, and the new more compact generator is shuffled between the remaining <br />stations as needed, <br />