My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 05-30-2000
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2000
>
CCP 05-30-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:16:05 PM
Creation date
11/13/2006 1:24:20 PM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
237
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />....-' <br /> <br />.., <br /> <br />~l€ I ,tM/i-6 <br />~Tl6'Y\ <br /> <br />F ~ Lf: <br /> <br />~~~ <br />5/S2JIOU~ <br />~. <br /> <br />, <br /> <br />CITY OF ARDEN HILLS <br /> <br />MEMORANDUM <br /> <br />DATE: May 30, 2000 <br /> <br />TO: Joe Lynch, City Administrator <br /> <br />FROM: Dave Scherbel, Building Official <br /> <br />SUBJECT: Fire Sprinkler Extension for Mounds View High School <br /> <br />The Mounds View High School was issued orders, by the State Fire Marshall, to <br />upgrade their corridors to 1 hour or install a fire sprinkler system by the year 2001. <br />The school originally planned to be completed with a fire sprinkler system by then, <br />but due to the passing of the bond referendum, substantial alterations are taking <br />place at Mounds View High School over the next three years. Due to the scope of <br />the new work, and renovations that will be taking place, complying with a <br />completion date by the end of 2001 would create an economic hardship and possibly <br />duplication in efforts (i,e. installing a sprinkler system in areas that within 2 years <br />would be altered.) <br /> <br />I believe that the high school is being reasonable in its request for a time extension <br />for completion of the sprinkler system. I would recommend that the City seek a <br />schedule for phasing in ofthe sprinkler system, so that sprinklers can be operational <br />as quickly as possible, starting first in areas not to be altered, and finishing in the <br />areas newly constructed. Second, the City should see what steps are being taken to <br />make sure the building is safe during the construction process, including emergency <br />access to buildings, and exiting from the building during the construction process. <br /> <br />The City, in considering the request for an extension of time for completing the fire <br />sprinkler system, can endorse, deny, modify or defer the matter to the State Fire <br />Marshall, See the attached correspondence from the State Fire Marshall and the <br />Lake Johanna Fire Inspector. <br /> <br />I would recommend that the City defer the request to the State Fire Marshall for <br />approval. <br />
The URL can be used to link to this page
Your browser does not support the video tag.