My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 07-31-2000
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2000
>
CCP 07-31-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:16:10 PM
Creation date
11/13/2006 1:25:13 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br />~ <br /> <br />. ~. <br />~. <br />, <br /> <br />, <br /> <br /> <br />Dalsln; <br /> <br />John A. Dalsin & Son, Inc. <br />2830 South 20th Avenue <br />Minneapolis, MN 55407 <br />(612) 729-9334 . Fax (612) 729-9330 <br />e-mail: info@dalsin.com <br /> <br />ROOANG AND SHEET METAL CONTRACTORS SINCE 1912 <br /> <br />. <br /> <br />. <br /> <br />July 10, 2000 <br /> <br />Mr. Dwayne Stafford <br />City of Arden Hills <br />4364 West Round Lake Road <br />Arden Hills, MN 55112 <br /> <br />RE: Proposal <br />2000 Roof Replacement project <br />Arden Hills Maintenance Garage <br />Arden Hills, MN <br /> <br />Dear Mr. Stafford, <br /> <br />We propose to furnish the necessary labor, material and equipment required to do the reroofing, <br />roof insulation and sheet metal work as follows: <br /> <br />Demolition <br /> <br />1. Remove the present gravel surfaced roofing membrane and insulation down to the top ofthe <br />existing steel deck. <br />2. Remove the felt base flashing from walls, curbs and roof edge cant. <br />3. Remove the sheet metal flashing room roof edge. <br />4. Haul away debris. <br /> <br />Carpentry <br /> <br />1. Install additional wood blocking at roof edge cant to accommodate new insulation thickness. <br />2. Install new wood support blocks under gas and electrical pipes. Set on a piece of closed-cell <br />styrofoam to protect roof. <br /> <br />Roof Insnlation <br /> <br />I. Loose lay %" perlite on steel deck. <br />2. Loose lay tapered EPS (1# density expanded polystyrene) over perlite. Total R = 22.22. <br />3. Create a sump at roof drains by tapering insulation down to improve drainage. <br />4. Create a sump at scuppers by tapering insulation down to improve drainage. <br /> <br />(See following page) <br /> <br />ALL TYPES OF COMMERClAL/INDUSTRIAL ROOFING & SHEET METAL <br />REPAIRS. PREVENTIVE MAINTENANCE. REPLACEMENT. NEW CONSTRUCTION <br />AN EQUAL OPPORTUNITY EMPLOYER <br />
The URL can be used to link to this page
Your browser does not support the video tag.