Laserfiche WebLink
<br />. <br /> <br />CITY OF ARDEN HILLS <br /> <br />TO: <br /> <br /> <br />EMORANDUM <br /> <br />DATE: <br /> <br />,,/" <br /> <br />Milyo~-;~d City Council <br /> <br />FROM: <br /> <br />.Joe Lynch, City Administrator <br /> <br />SUBJECT: <br /> <br />City Hall Construction Bids <br /> <br />Backeround <br />The City received bids for construction of the new City Hall on Wednesday, May 24, 2000, Bids <br />were received from ten (10) bidders, with base bids ranging from $2,735,000 to $3,470,000. The <br />bids included: <br /> <br />. <br /> <br />Base Bid for Project <br />Alternate 2, deduct (remove stone masonry) <br />Alternate, add windows (different style than first floor windows) <br />Alternate, to add windows (same style as first floor windows) <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. The apparent low bidder was Rochon Corporation, Their full bid was as follows: <br /> <br />. <br /> <br />. Base Bid = <br />. Alternate No, 1, Deduct <br />(Brick) <br />. Alternate No, 2, Add = <br />(Windows) <br />. Alternate No, 3, Add <br />(Windows) <br /> <br />$2,735,000 <br />( 315,000) <br /> <br />16,000 <br /> <br />25,000 <br /> <br />The architect's preliminary estimate for the construction of the project was $2,500,000, This <br />estimate was for the base bid, What follows is a comparison between the bids received in 1999, <br />and those received in 2000 for the City Council to observe the differences and make some <br />determinations about the alternates proposed, <br /> <br />Base Bid <br />Furnishings <br />Water/Sewer Utilities <br />AudioNisual <br />Phone System <br /> <br />1999 <br />$2,489,000 <br />135,000 <br />180,000 <br />188,000 <br />70.000 <br /> <br />2000 <br />$2,735,000 <br />140,000* <br />166,000 <br />180,000 <br />72,500* <br /> <br />* Adjusted for Inflation <br /> <br />$3,062.000 <br /> <br />$3.293,500 <br />