My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 08-28-2000
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2000
>
CCP 08-28-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:16:13 PM
Creation date
11/13/2006 1:25:37 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> 18. <br />. 19. <br /> 20. <br /> 21. <br /> 22. <br /> 23. <br /> 24. <br /> 25. <br /> 26. <br /> <br />. <br /> <br />. <br /> <br />, <br /> <br />t;.yh~ b i-t b <br /> <br />k: <br />:3 <br /> <br />Modification of the building's exteriors (Phase 11, III, and IV) as outlined in Findings- <br />Variance #5, items 2-13. <br />Modification of the parking spaces to eliminate the variance as outlined in Findings _ <br />Other Variances, item 3. <br />Provision of the necessary drainage and utility easements on the plat. <br />Provision of the necessary access easements (Vaughn Towers) on the plat. <br />Extension of the relocated 14th Street to the southeastern-most portion of Lot 3. <br />Payment and/or dedication of park land as recommended by the Parks and Recreation <br />Director. <br />Execution of all development agreements prior to consideration of the final plat by the <br />City Council. <br />Provision of revised design with more 3-D relief for the entrances and sides of Phase II <br />building to the City Council. <br />Approval by the Fire Chief of all building address locations. <br /> <br />t <br /> <br />. <br />The City Council on July 14, 1997, approved the PUD Master Plan. including Landscape Plan <br />and Variances, and Preliminary Plat in Planning Case 97-06, subject to the following conditions: <br /> <br />1. Provision of the street name for the relocated 14th Street as Gateway Boulevard. <br />STATUS - (Condition Satisfied). The plans provide for the new street names. <br />2. No issuance of occupancy permits until such time that the relocated Round Lake Road is <br />open for traffic and capable of accepting increased traffic. <br />STATUS - (pending). The applicant's traffic engineer has reviewed this condition and is <br />requesting a modification of this condition. The discussion on this modification can be found in <br />the Update section of this memorandum item number one. <br />3. Compliance with the approval of the Rice Creek Watershed District. <br />STATUS - (pending). This condition is reviewed for compliance during construction. <br />4. Approval of and compliance with an NPDES permit by the MPCA. <br />STATUS - (pending). This condition is reviewed for compliance during construction. <br />5. Compliance with the City Engineer's letter dated June 24,1997. <br />STATUS - (Pending). The grading plan has been modified in an attempt to minimize the <br />exportation of material from the site. Therefore, the engineers letter is dated and he will be <br />providing a revised letter at the meeting. <br />6. The smallest amount of bare ground is exposed for as short a time as feasible. <br />STATUS - (pending). This condition is reviewed for compliance during construction. <br />7. Temporary ground cover, such as mulch, is used and permanent ground cover, such as <br />sod, is established. <br />STATUS - (pending). This condition is reviewed for compliance during construction. <br />8. Methods to prevent erosion and trap sediments are employed. <br />STATUS - (pending). This condition is reviewed for compliance during construction. <br />9. Fill is stabilized to accepted engineering standards, approved by the City Engineer. <br />STATUS - (pending). This condition is reviewed for compliance during construction. <br />10. Approval of and compliance with wetland permits by the U.S. Army Corps of Engineers. <br />STATUS - (pending). This condition is reviewed for compliance during construction. <br /> <br />Stpte-w\~ '),'].., Iqq-:r <br /> <br />~o to ~ &.--h-t ~I <br />
The URL can be used to link to this page
Your browser does not support the video tag.