Laserfiche WebLink
<br />I <br /> <br />~ <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />II <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />I <br /> <br />City of Arden Hills <br />2000 Street Reconstruction Program <br /> <br />FERNWOOD COURT CONSTRUCTION <br /> <br /> Unit <br />No. Item Unit Ouantitv Price Extension <br />I Mobilization LS 1.00 $ 1,500.00 $ 1,500.00 <br />2 Bituminous Pavement Removal SY 250.00 $ 2.00 $ 500.00 <br />3 Miscellaneous Removals LS 0.05 $ 20,000.00 $ 1,000.00 <br />8 Bituminous Wear Course (2") TON 108.00 $ 32.00 $ 3,500.00 <br />9 Bituminous Material for Tack Coat GAL 48.00 $ 1.90 $ 100.00 <br />10 Concrete Curb and Gutter (B618) LF 655.00 $ 8.00 $ 5,200.00 <br />11 Traffic Control LS 0.05 $ 25,000.00 $ 1,300.00 <br />12 Signage SF 9.00 $ 30.00 $ 300.00 <br />13 Sodding SY 1,615.00 $ 3.00 $ 4.800.00 <br />14 Driveway Removal SY 95.00 $ 5.00 $ 500.00 <br />15 Biluminous Pavement (Driveway) SY 134.00 $ 25.00 $ 3,400.00 <br />16 Concrete Pavement (Driveway) SY 30.00 $ 40.00 $ 1,200.00 <br />17 Sawing Bituminous Pavement LF 750.00 $ 2.00 $ 1,500.00 <br /> Subtotal Construction Cost $ 24,800.00 <br /> 15% Contingency $ 3,700.00 <br /> SUBTOTAL Construction Cost wi Contingency $ 28,500.00 <br /> 26% Indirect Cost and Capitalized Interest $ 7,400.00 <br /> <br />Total Estimated Project Cost - <br /> <br />$ 35,900.00 <br />