Laserfiche WebLink
<br />I <br />'- <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />. <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />I <br /> <br />City of Arden Hills <br />2000 Street Reconstruction Program <br /> <br />INGERSON ROAD STORM SEWER CONSTRUCTION <br />(BASED ON 28' F-F) <br /> <br /> Unit <br />No. Item Unit Ouantitv Price Extension <br />1 Mobilization LS 1.0 $ 1,700.00 $ 1,700.00 <br />2 12" RCP LF 28.0 $ 25.00 $ 700.00 <br />3 15" RCP LF 500.0 $ 30.00 $ 15,000.00 <br />4 18" RCP LF 55.0 $ 28.00 $ 1,500.00 <br />5 21" RCP LF 98.0 $ 136.50 $ 13,400.00 <br />6 36" RCP LF 23.0 $ 60.00 $ 1,400.00 <br />7 Catch Basin (2' x 3') EA 11.0 $ 1,200.00 $ 13,200.00 <br />8 Manhole (48") EA 1.0 $ 2,500.00 $ 2,500.00 <br />9 Manhole Catch Basin (60") EA 1.0 $ 3,000.00 $ 3,000.00 <br />10 12" RCP Apron and Trashguard EA 2.0 $ 1,000.00 $ 2,000.00 <br /> Subtotal Construction Cost $ 54,400.00 <br /> 15% Contingency $ 8,200.00 <br /> SUBTOTAL Construction Cost wI Contingency $ 62,600.00 <br /> 26% Indirect COSl and Capitalized Interest $ 16,300.00 <br /> <br />Total Estimated Project Cost <br /> <br />$ 78,900.00 <br />