Laserfiche WebLink
<br />I <br /> <br />~ <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />II <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />i- <br /> <br />I <br /> <br />City of Arden Hills <br />2000 Street Reconstruction Program <br /> <br />HAMLINE CHANNEL CONSTRUCTION <br /> <br /> Unit <br />No. Item Unit Ouantity Price Extension <br />1 Clearing and Grubbing TREE 4.0 $ 200.00 $ 800.00 <br />4 Rip Rap CY 100.0 $ 53.50 $ 5,400.00 <br />5 36" Pipe Apron EA 3.0 $ 2,000.00 $ 6,000.00 <br />6 36" RCP LF 30.0 $ 60.00 $ 1,800.00 <br />7 Channel Grading LS 1.0 $ 30,000.00 $ 30,000.00 <br />8 Wetland Grading LS 1.0 $ 5,000.00 $ 5,000.00 <br />9 Weir EA 3.0 $ 2,500.00 $ 7,500.00 <br />10 Trail LF 560.0 $ 15.00 $ 8,400.00 <br />11 Restoration LS 1.0 $ 2,500.00 $ 2,500.00 <br />12 Landscaping LS 1.0 $ 5,000.00 $ 5,000.00 <br /> Sublotal Construction Cost $ 72,400.00 <br /> 15% Conlingency $ 10,900.00 <br /> SUBTOTAL Construction Cost wI Contingency $ 83,300.00 <br /> 26% Indirect Cost and Capitalized Interest $ 21,700.00 <br /> <br />Total Estimated Project Cost - $ 105,000.00 <br />