Laserfiche WebLink
<br />I <br /> <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />. <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />;- <br /> <br />I <br /> <br />City of Arden Hills <br />2000 Street Reconstruction Program <br /> <br />FERNWOOD CHANNEL CONSTRUCTION <br /> <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br /> <br /> Unit <br />Ilem Unit Quanti tv Price Extension <br />Clearing and Grubbing TREE 8.0 $ 200.00 $ 1.600.00 <br />Rip Rap CY 50.0 $ 53.50 $ 2,700.00 <br />Retaining Wall SF 200.0 $ 20.00 $ 4,000.00 <br />Weir LS 1.0 $ 10,000.00 $ 10,000.00 <br />SliIling Basin Grading LS 1.0 $ 7,500.00 $ 7,500.00 <br />Resloration LS 1.0 $ 500.00 $ 500.00 <br />Landscaping LS 1.0 $ 2,500.00 $ 2,500.00 <br />Subtotal Construction Cost $ 28,800.00 <br />15% Contingency $ 4,300.00 <br />SUBTOTAL Construction COSl wi Contingency $ 33,100.00 <br />26% Indirect Cost and Capitalized Interest $ 8,600.00 <br /> <br />No. <br /> <br />Total Estimated Project Cost. <br /> <br />$ 41,700.00 <br />