Laserfiche WebLink
<br />I <br /> <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />. <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />.. <br /> <br />I <br /> <br />City of Arden Hills <br />2000 Street Reconstruction Program <br /> <br />W A TERMAIN IMPROVEMENTS <br /> <br />No. <br /> <br />Item <br /> <br />Unit Quantity <br /> <br />Unit <br />Price <br /> <br />1 <br />2 <br />3 <br />4 <br />5 <br /> <br />Mobilization LS <br />DIP Fittings lbs <br />SpOl Repair/ Relocate 6" DIP LF <br />Spot Repair/ Relocate 8" DIP LF <br />Relocate Hydrant EA <br />Subtotal Construction Cost <br /> <br />15% Contingency <br /> <br />SUBTOTAL Construction Cost w/ Contingency <br />26% Indirect Cost and Capitalized Interest <br /> <br />1.0 $ 2,800.00 <br />500.0 $ 3.00 <br />50.0 $ 40.00 <br />50.0 $ 50.00 <br />18.0 $ 2,500.00 <br /> <br />Total Estimated Project Cost - Watermain Improvements <br /> <br />Extension <br /> <br />$ 2,800.00 <br />$ 1,500.00 <br />$ 2,000.00 <br />$ 2,500.00 <br />$ 45,000.00 <br />$ 53,800.00 <br /> <br />$ 8,100.00 <br /> <br />$ 61.900.00 <br />$ 16,100.00 <br /> <br />$ 78,000.00 <br />