Laserfiche WebLink
<br />t <br />e <br /> <br />e <br /> <br />e <br /> <br />(4) Location of site improvements, including drives, parking lots or structures, landscape <br />areas and any other site features that will aid the City in evaluating the application. <br /> <br />(5) Location and height of proposed antenna, dish antenna or tower. <br /> <br />(6) Elevation drawing of proposed antenna, dish antenna or tower. <br /> <br />b. Site Elevation Drawings and/or Site Section Drawings. Drawings shall be provided that <br />show how the screening will effectively be accomplished as defined in (6) above. Site lines <br />should be illustrated both in plan and section showing vertical and horizontal relationships to <br />neighboring properties. <br /> <br />c. All applications for the City's water towers must include a signed report from a state <br />registered engineer showing compliance with all applicable codes, standards and structural <br />requirements of how the additional antennas will affect the water tower structure. A final <br />inspection report from a state registered engineer showing work completed in compliance with <br />previously approved plans shall also be required. <br /> <br />d. A building permit shall be required for all applications except those as stated in Section VI <br />(I) # 1. <br /> <br />Effective Date. <br /> <br />This ordinance shall become effective the day following its publication. <br /> <br />Adoption Date. <br /> <br />Passed by the City Council of the City of Arden Hills the 10th day of <br />October, 2000. <br /> <br />DENNIS PROBST, MAYOR <br /> <br />ATTEST: <br /> <br />JOSEPH P. LYNCH, CITY ADMINISTRATOR <br /> <br />Publication Date. Published on the <br /> <br />of <br /> <br />,2000. <br />