My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 10-29-2001
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2001
>
CCP 10-29-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:16:25 PM
Creation date
11/13/2006 2:35:38 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />-e <br /> <br />Memo to City Council <br />- Planmng Case #UI-12: Arden South ApaiTiuents <br />Page 7 of11 <br /> <br />Pro osed Parkiu <br />87 S aces <br /> <br />Code Re uirement <br />60 S aces <br /> <br />Recommended <br />99 S aces <br /> <br />The Zoning Ordinance requires that the spaces be not less than nine (9) feet by eighteen (18) feet <br />in size, as all spaces are shown on the proposed plan. The proposal also complies with the 20 <br />foot setback from the right-of-way. The entire parking area will be curbed, surfaced and striped <br />in accordance with City design standards. <br />7. Access and Circulation. - Meets Code Requirement <br /> <br />One access to the property is proposed onto Cleveland A venue. The access to the public street is <br />proposed to be 20 feet wide, exceeding the requirements for a residential driveway. A permit <br />from Ramsey County would need to be obtained for the curb cut. The Fire Inspector has <br />reviewed the plans and is satisfied with the access and circulation of the property. <br /> <br />8. Screening - Meets Code Requirement <br /> <br />e <br /> <br />There are significant physical and natural buffers to adjacent properties. To the east, a heavily <br />wooded ravine and creek provide separation from the single-family residences on New Brighton <br />Road. I-35W borders the property to the west, and predominantly open areas abut the property to <br />the north and south. Coniferous trees and other landscaping planted along County Road E2 and <br />Cleveland Avenue will provide an appropriate buffer for the parking lot. Trash receptacles will <br />be located within the underground parking so screening is not an issue. <br /> <br />9. Lighting - Information Not Available <br /> <br />A lighting plan was not submitted with the application. This will be detailed in the architectural <br />package. All lighting must be directed away from adjoining lots or public streets and must be <br />hooded so that light is only directed onto the subject property. <br /> <br />10. Sign age - Meets Code Requirement <br /> <br />While no signage plan was submitted, the applicant's narrative statement indicates the <br />following with regard to signage: <br /> <br />The building will have a 4 foot by 6 foot identification sign on the boulevard in conformance with <br />the materials and colors used on the exterior of the building, with the building name and address. <br /> <br />The applicant is proposing a 24 square foot sign. The sign code allows for one 50 square foot <br />sign in this type of development. A plan highlighting the location of the proposed signage will <br />e be requested of the applicant and provided at the Planning Commission meeting. <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.