My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 11-26-2001
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2001
>
CCP 11-26-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:16:27 PM
Creation date
11/13/2006 2:35:44 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Memo to City Council <br />1'lannmg-caseJr0T::22::A:rden 50uth Apaftfijimls <br />Page 8 of 11 <br /> <br />e- <br /> <br />11. Grading and Utilities. Pending Evaluation By City Engineer <br /> <br />At this point, the City Engineer has not had the opportunity to review the plans submitted by the <br />applicant. The property would be serviced by existing utilities (sewer, water, gas, electric, and <br />telephone) from Cleveland Avenue. Drainage would be accommodated by a retention pond that <br />is proposed on the southern part of the property. Approximately 366 square feet of wetland <br />would be filled near the pond and southwest portion of the building. Silt fencing will be <br />provided along the eastern border of the property to minimize erosion during construction. Staff <br />would suggest approval be conditioned on compliance with any suggestions provided by the City <br />Engineer. <br /> <br />12. Aesthetics <br /> <br />A colored building elevation has been attached for your review. The base of the building will be <br />constructed of a rock face concrete block. The Commission might consider requesting the <br />applicant use an alternative material such as brick, or similar material, up to the first floor <br />window line of the West (front), North (facing County Road E2), and South (visible from <br />Cleveland) sides ofthe building. Brick, or a similar material, covering the garage level of the <br />East (rear) side of the building would seemingly be appropriate. <br /> <br />e <br /> <br />Alternating columns ofhardiplank (durable composite siding) lap siding and hardipanel stucco <br />comprise the remainder of structure. The gable pitched roof provides some additional detail to <br />the roofline. While the balconies will not be functional (false balcony), they do provide some <br />additional architectural detail to the building fayade. <br /> <br />13. Additional Considerations <br /> <br />There is currently a city lift station located on the property. However, when the applicant <br />surveyed the property, no easement authorizing the City's use of the property had been recorded <br />and/or executed with the County. While an-easement was contemplated in conjunction with a <br />development proposed by Hans Hagen, it does not appear as if it was ever finalized. A search of <br />the City's easement records also failed to produce any easement document. To rectifY the <br />situation, the applicant has offered the City an easement. <br /> <br />Deadline for Al!encv Actions <br /> <br />The original application for this planning case was received in June. At that time, the application <br />was found to be incomplete. On June 20, 200 I, the applicant waived 60 day review requirement. <br />Accordingly, the City is not required to review this application within the traditional 60 day time <br />frame. For reference, a completed application for this request was received on September 14th, 2001. <br /> <br />8 <br /> <br />, <br />
The URL can be used to link to this page
Your browser does not support the video tag.