My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 02-20-2001
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2001
>
CCP 02-20-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:16:30 PM
Creation date
11/13/2006 2:36:09 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />CITY OF ARDEN HILLS <br /> <br />MEMORANDUM <br /> <br />DATE: <br /> <br />February 16,2001 <br /> <br />TO: <br /> <br />J~rwJl~ <br /> <br />Mayor and City Council <br /> <br />FROM: <br /> <br />Joe Lynch, City Administrator <br /> <br />SUBJECT: <br /> <br />Architectural Alliance Request for Re-Bid and Construction Phase <br />Administration Cost Adjustment <br /> <br />Recommendation <br />Staff recommends that the City Council authorize payment in an amount equal to $20,844,00 to <br />Architectural AlIianee for the difference in designing and construction phase portions ofthe <br />contract, due to the ehange in the scope of services, and the construction cost adjustments, on the <br />construction of the new City Hall. <br /> <br />Back\!:round <br />In July of 1997, the City received a proposal letter from Architectural Alliance for services based <br />on a building and site budget of$1,120,000. There was no fee agreed to at that time, but the <br />following eost for services was outlined per the AlA eontract. <br /> <br />. In Article 12 of Section 2.2 and 2.6 <br /> <br />Schematic Design 15% <br />Design Development Documents 20% <br />Construetion Documents (which included 40% <br />drawings and specifications) <br />Bidding Assistance 5% <br />Construction Phase Administration 20% <br /> <br />In August of 1998, the building and site plan was adjusted for a building of 15,102 square feet at <br />a proposed cost estimate of $2,151 ,913.00. In September of 1998, the agreed-upon fee was <br />$99,800,00, based on a 10,000 square foot building at a eost ofthe building and site of <br />$1,120,000. That was adjusted up to a $184,500, fee, based on the previously aforementioned <br />size of the building and size estimate, <br /> <br />In October of 1998, an amendment letter was signed by the City of Arden Hills and Arehitectural <br />Alliance agreeing to a fee of$162,500,OO, based on the same size building (15,102 square feet) <br />and site design plan, and a furnishings budget was established at $150,000, <br /> <br />In December of 1998, Article 11,2,1 was amended to allow for the provision that if the City of <br />Arden Hills inereased the size of the building, or the budget beyond the $1,187,750,00, the fee <br />for basic serviee and site design would be adjusted as mutually agreed upon. <br />
The URL can be used to link to this page
Your browser does not support the video tag.