<br />. <br /> <br />. <br /> <br />. <br /> <br />Memorandum, Architectural Allianee Request for Re-Bid and Construction Phase <br />Administration Cost Adjustment <br /> <br />Page Two <br />February 16,2001 <br /> <br />In April of2000, the estimated cost ofthe building rose to $2,942,000,00 for the same size <br />building, based on adjustments that included utility work, expansion of the basement, and stone <br />exterior. In March of that year, we were sent a letter by Arehitectural Alliance alerting us to the <br />fact that they would be asking tor an increase in their fee, adjusted according to Article 11,2,1, <br /> <br />At this time, it seems to come down to what Arehitectural Alliance should be paid, not if they <br />should be paid, I've done the following calculations, based on the contract language, and my <br />understanding of the relationship between the architect and owner. I've deducted out $315,000 <br />from the $2,942,000 cost for the stone to bring it into alignment with the previously mentioned <br />cost of$1,887,500,OO, <br /> <br />20% of8,6% of$2,627,000 $45,184.00 <br />Minus 20% of 8.6% of $1 ,887,500, 32,465,00 <br />Difference 12,719,00 <br />Add baek the Re-bid Assistance Fee 8,125,00 <br />New Total $20,844.00 <br />Difference from requested Architectural Alliance $1.445.00 <br />amount of $22,289,00, <br /> <br />(This is basically 20% of8.6% difference between the $2,711.00,00 that Peter <br />Vesterholt uses, and the $2,627,000 number that I use in comparing the <br />construction phase and re-bid assistance without stone,) <br /> <br />The architect and the City have agreed at this time, that the re-bid assistance fee should be the <br />same amount, based on the faet that the scope of services shouldn't have expanded once the <br />drawings and changes in building design had been completed, The architect was paid an <br />additional $25,000 for the expansion ofthe basement, the inclusion of the windows, and the <br />movemcnt of the oi1ices from the second floor to the main level. <br /> <br />I will not be able to be in attendance at the meeting on February 20th, Mr. Post will be in <br />attendance, and I will update him to allow him to answer any of your questions at the meeting, I <br />will also contact you by phone on Friday to properly explain this before the meeting, <br />