Laserfiche WebLink
<br />,- <br /> <br />ARLHITHTURAl ALLIANCE <br /> <br />e <br /> <br />Febru"'Y 9, 2001 <br /> <br />400 C llFTO N AVEN UE so lJTH <br /> <br />Mr. Joe 4'nch <br />City Administrator <br />Arden Hills City Hall <br />Round Lake Business Center <br />4364 W. Round Lake Rd. <br />Arden Hills, MN 55112.5794 <br /> <br />MINNEAPOLIS, MINNESOTA 55403-3299 <br /> <br />TELEP H 0 N E (6121 871-5703 <br /> <br />FAX 1612) 871.7212 <br /> <br />Re: Professional Design SelVices Fee <br />New City Hall Project <br />Comm, No. 97149 <br /> <br />Dear Joe: <br /> <br />e <br /> <br />This is a follow up to our March 8, 2000 leller, our January 17, 200 I meeting, and our Janu"'Y 18,200 Ileller <br />regarding additional professional design fees for the New City Hall project. <br /> <br />R~mlest for Rpbic1 Fpp. <br />After the project was bid in 1999 (and before it was determined to ultimately rebid the project in 2000 when <br />the land transfer had taken place), we discussed with the City Council the cost that the City would incur to <br />rebid the project. In addition to the cost of inflation, these costs would consist of the design team's time to <br />reissue the bidding documents, be available to answer calls from bidders, issue addenda, attend the bid- <br />opening, etc. This phase equates to $8,125 or 5% of the original $162,500 total basic services fee. In addition, <br />the City would incur the costs to reprint the project for bidding in 2000 (approximately $12.500). <br /> <br />There appears to be some confusion about the rebid issue, because the City requested that we revise certain <br /> <br />parts of the project before we reissued the documents in 2000. However, the revisions made were drawing <br /> <br /> <br />(scope) changes requested by the City (office relocations, addition of windows, enlargement of the basemen~ <br /> <br />etc.) and as such they were an additional ($25,000) service which we were compensated for, These scope <br /> <br />changes did not include our time to rebid the project. <br /> <br />. <br /> <br />The rebidding phase is analogous to the efforts of a realtor to sell the same house twice, The fact that there <br /> <br /> <br />were scope changes incOfporated in the second bidding of the project did not change our wolk effort during <br />